Environmental Management & Construction Plans

An Environmental Management and Construction Plan (EM&CP) was developed for each segment of the CHPE project to provide the plans and specifications for environmental protections and construction in compliance with applicable laws and regulations, including the CHPE project’s Certificate of Environmental Compatibility and Public Need issued by the New York State Public Service Commission.  A map of the CHPE project segments is available here.

 

All EM&CPs, project-wide, have been submitted to and approved by the New York State Public Service Commission as of March 2025. A copy of each filing along with supporting documents can be found below.

Approved Filings

PSC Errata Notice for Segment 1 and 2 EMCP

PSC Order Approving Segment 1 and 2 EMCP

 

Construction Notice for Segments 1 and 2

220415 Cover Letter Filing Segment 1 and 2 EMCP

Narrative for Segment 1 and 2 EMCP

 

Appendices for segment 1 and 2 EMCP

Appendix A. Agency Correspondence_REV1

Appendix B. EM&CP Filing Notices

 

Appendix C. Plan and Profiles, ESC, MPT_REV1

Appendix C. Plan and Profiles, ESC, MPT_REV1_part1of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part2of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part3of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part4of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part5of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part6of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part7of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part8of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part9of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part10of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part11of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part12of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part13of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part14of15

Appendix C. Plan and Profiles, ESC, MPT_REV1_part15of15

 

Appendix D. Compliance Crosswalk_REV1

Appendix E. Work Outside the Deviation Zone_REV1

Appendix F. Compliance Assurance Plan_REV1

 

Appendix G. Stormwater Pollution Prevention Plan_REV1

Appendix G. Stormwater Pollution Prevention Plan_REV1_part1of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part2of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part3of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part4of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part5of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part6of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part7of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part8of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part9of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part10of11

Appendix G. Stormwater Pollution Prevention Plan_REV1_part11of11

 

Appendix H. Construction and Safety Policies and Procedures_REV1

Appendix I. Public Involvement and Complaint Resolution Plan_REV1

 

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part1of8

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part2of8

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part3of8

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part4of8

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part5of8

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part6of8

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part7of8

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part8of8

 

Appendix K. Spill Prevention Control and Countermeasures Plan_REV1

Appendix L. Soil and Materials Management Plan_REV1

 

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part1of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part2of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part3of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part4of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part5of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part6of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part7of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part8of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part9of10

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part10of10

 

Appendix N. Invasive Species Control Plan_REV1

Appendix O-CRMP 9-30-22_Redacted

Appendix P. Capacity Ampacity and Thermal Calculations

Appendix Q. Corrosive Effects Study

Appendix R. Documentation of CI Consultation Occurred_REV1

Appendix S - Segment 1 and 2 CHPE Overland Rock Removal Plan_REV1

PSC Order Approving Segment 3 EMCP

 

Construction Notice for Segment 3

221223 Cover Letter Filing Segment 3 EMCP

Narrative for Segment 3 EMCP

 

Appendices for segment 3 EMCP

Segment 3_Appx A_Agency Correspondence_Package 1C+2_IFC _Submittal Set_04122023

Segment 3_Appx B_EM&CP Filing Notices

 

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 1 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 2 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 3 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 4 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 5 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 6 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 7 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 8 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 9 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 10 of 10

 

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 1 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 2 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 3 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 4 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 5 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 6 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 7 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 8 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 9 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 10 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 11 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 12 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 13 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 14 of 14

 

Segment 3_Appx D_BMP Compliance Cross Walk

Segment 3_Appx E_RevisedDeviationZoneJustification_Pkg1C_IFC_Submittal Set

Segment 3_Appx E_RevisedDeviationZoneJustification_Pkg2_IFC_Submittal Set

Segment 3_Appx F_Compliance Assurance Plan

 

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 1 of 3

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 2 of 3

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 3 of 3

 

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 1 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 2 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 3 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 4 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 5 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 6 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 7 of 7

 

Segment 3_Appx H_ Construction and Safety Policies and Procedures

Segment 3_Appx I_Revised Public Involvement Program Plan

Segment 3_Appx J_HDD DSR_Pkg1C_IFC_Submittal Set - Stamped Part 1 of 2

Segment 3_Appx J_HDD DSR_Pkg1C_IFC_Submittal Set - Stamped Part 2 of 2

 

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 1 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 2 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 3 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 4 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 5 of 5

 

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 1 of 3

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 2 of 3

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 3 of 3

 

Segment 3_Appx K_RevisedSPCC_Pkg1C-2_IFC_Submittal Set

Segment 3_Appx L - Soil Management Plan-FINAL

 

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 1 of 3

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 2 of 3

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 3 of 3

 

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 1 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 2 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 3 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 4 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 5 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 6 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 7 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 8 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 9 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 10 of 10

 

Segment 3_Appx N_Invasive Species Control Plan_Pkg1C-2_IFC_Submittal Set

 

Segment 3_Appx O_SCRMP_PKG1C_Public

Segment 3_Appx O_SCRMP_PKG2_Public

Segment 3_Appx P_Corrosive Effects Study

Segment 3_Appx Q_Cable Ampacity and Thermal Calculations

 

Segment 3_Appx CIConsultation_Pkg1C_IFC_Submittal Set

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 1 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 2 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 3 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 4 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 5 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 6 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 7 of 7

 

Segment 3_Appx S_Overland Rock Removal Plan

 

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 1 of 3

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 2 of 3

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 3 of 3

PSC Order Approving Segment 4 and 5 EMCP

 

Construction Notice for Segments 4 and 5

230421 Cover Letter Filing Segment 4 and 5 EMCP

Narrative for Segment 4 and 5 EMCP

 

Appendices for segment 4 and 5 EMCP

Segment 4 and 5_Appx A_Agency Correspodence_Pkg3_Final Submittal

Segment 4 and 5_Appx B_EM&CP Filing Notices

 

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 1 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 2 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 3 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 4 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 5 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 6 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 7 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 8 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 9 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 10 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 11 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 12 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 13 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 14 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 15 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 16 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 17 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 18 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 19 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 20 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 21 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 22 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 23 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 24 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 25 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 26 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 27 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 28 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 29 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 30 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 31 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 32 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 33 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 34 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 35 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 36 of 37

Segment 4 and 5_Appx C_Plan and Profile Drawings_Pkg 3_Final_Submittal Part 37 of 37

 

Segment 4 and 5_Appx D_Compliance Crosswalk_Pkg3_Final_Submittal

 

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 1 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 2 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 3 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 4 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 5 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 6 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 7 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 8 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 9 of 10

Segment 4 and 5_Appx E_DeviationZone_Pkg3_Final_Submittal Part 10 of 10

 

Segment 4 and 5_Appx F_Compliance Assurance Plan_Pkg3_Final_Submittal

 

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 1 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 2 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 3 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 4 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 5 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 6 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 7 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 8 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 9 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 10 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 11 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 12 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 13 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 14 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 15 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 16 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 17 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 18 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 19 of 20

Segment 4 and 5_Appx G_SWPPP_Pkg3_FInal_Submittal Part 20 of 20

 

Segment 4 and 5_Appx H_Construction and Safety Policies and Procedures_Pkg3_Final_Submittal

Segment 4 and 5_Appx I_Public Involvement Plan_Pkg3_Final_Submission

 

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 1 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 2 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 3 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 4 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 5 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 6 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 7 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 8 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 9 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 10 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 11 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 12 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 13 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 14 of 15

Segment 4 and 5_Appx J_HDD DSR_Pkg3_Final_Submittal Part 15 of 15

 

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 1 of 9

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 2 of 9

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 3 of 9

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 4 of 9

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 5 of 9

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 6 of 9

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 7 of 9

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 8 of 9

Segment 4 and 5_Appx J_HDD IRCP_Pkg3_Final_Submittal Part 9 of 9

 

Segment 4 and 5_Appx K_SPCC_Pkg3_Final_Submittal

Segment 4 and 5_Appx L_SoilMaterialMAnagementPlan_Pkg3_Submittal Set

 

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 1 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 2 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 3 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 4 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 5 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 6 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 7 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 8 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 9 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 10 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 11 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 12 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 13 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 14 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 15 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 16 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 17 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 18 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 19 of 20

Segment 4 and 5_Appx M_WDR_Pkg3_Final_Submittal Part 20 of 20

 

Segment 4 and 5_Appx N_Invasive Species Control Plan_Pkg3_Final_Submittal

Segment 4 and 5_Appx O_Public_SCRMP_Revised_Pkg3_IFC_Submittal Set

Segment 4 and 5_Appx P_Corrosive Effects Study_Pkg3_Final_Submittal

Segment 4 and 5_Appx Q_Cable Ampacity and Thermal Calculations_Pkg3_Final_Submittal

Segment 4 and 5_Appx R_CI_Pkg3_IFC_Submittal Set_Redacted

Segment 4 and 5_Appx S_RockRemovalPlan_Pkg3_Final_Submittal

 

Segment 4 and 5_Appx T_CHPE Overland_ESSH_REDACTED_Pkg 3_Final_SubmittalSet

Segment 4 and 5_Appx T_CHPE Overland_ESSH_REDACTED_Pkg 3_Final_SubmittalSet Part 1 of 3

Segment 4 and 5_Appx T_CHPE Overland_ESSH_REDACTED_Pkg 3_Final_SubmittalSet Part 2 of 3

Segment 4 and 5_Appx T_CHPE Overland_ESSH_REDACTED_Pkg 3_Final_SubmittalSet Part 3 of 3

Notice of Change to Segment 6 EMCP_Firemans Lane with Map

CN 063_Firemans Lane HDD (Segment 6 EMCP)_Part 1 of 3

CN 063_Firemans Lane HDD (Segment 6 EMCP)_Part 2 of 3

CN 063_Firemans Lane HDD (Segment 6 EMCP)_Part 3 of 3

 

Notice of Change to Segment 7 EMCP_Freemans Bridge Road

CN 140_HDD 64A Revision and New HDD_20240627-1650 R1_Part1

CN 140_HDD 64A Revision and New HDD_20240627-1650 R1_Part2

CN 140_HDD 64A Revision and New HDD_20240627-1650 R1_Part3

 

PSC Order Approving Segment 6 and 7 EMCP

 

Construction Notice for Segments 6 and 7

230804 Cover Letter Filing Segment 6 and 7 EMCP

 

Segment 6

Narrative for Segment 6 EMCP

 

Appendices for Segment 6 EMCP

Segment 6_Appx A_Agency Correspondence_Pkg4A_IFC_Submittal Set

Segment 6_Appx B_EMCPFilingNotices

 

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-01 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-02 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-03 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-04 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-05 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-06 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-07 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-08 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-09 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-10 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-11 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-12 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-13 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-14 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-15 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-16 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-17 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-18 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-19 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-20 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-21 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-22 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-23 of 24

Segment 6_Appx C_Plan_and_Profile_Drawings_P4A_IFC_Submittal_Set_Part-24 of 24

 

Segment 6_Appx D_ComplianceCrosswalk_Pkg4A_IFC-Submittal Set

 

Segment 6_Appx E_DeviationZoneMemo_IFC_Submittal Set

Segment 6_Appx E_DeviationZoneMemo_IFC_Submittal Set-Part-1-of-4

Segment 6_Appx E_DeviationZoneMemo_IFC_Submittal Set-Part-2-of-4

Segment 6_Appx E_DeviationZoneMemo_IFC_Submittal Set-Part-3-of-4

Segment 6_Appx E_DeviationZoneMemo_IFC_Submittal Set-Part-4-of-4

 

Segment 6_Appx F_Compliance Assurance Plan_Pkg4A_IFC_Submittal Set

 

Segment 6_Appx G_SWPPP_Pkg4A_IFC_Submittal

Segment 6_Appx G_SWPPP_Pkg4A_IFC_Submittal-Part-1-of-4

Segment 6_Appx G_SWPPP_Pkg4A_IFC_Submittal-Part-2-of-4

Segment 6_Appx G_SWPPP_Pkg4A_IFC_Submittal-Part-3-of-4

Segment 6_Appx G_SWPPP_Pkg4A_IFC_Submittal-Part-4-of-4

 

Segment 6_Appx H_ ConstructionSafety_Pkg4A_IFC_Submittal Set

Segment 6_Appx I_PublicInvolvementPlan_Pkg4B_IFC_Submittal Set

 

Segment 6_Appx J_HDD DSR_Pkg4A_IFC_Submittal Set - Stamped

Segment 6_Appx J_HDD DSR_Pkg4A_IFC_Submittal Set - Stamped_Part-1 of 5

Segment 6_Appx J_HDD DSR_Pkg4A_IFC_Submittal Set - Stamped_Part-2 of 5

Segment 6_Appx J_HDD DSR_Pkg4A_IFC_Submittal Set - Stamped_Part-3 of 5

Segment 6_Appx J_HDD DSR_Pkg4A_IFC_Submittal Set - Stamped_Part-4 of 5

Segment 6_Appx J_HDD DSR_Pkg4A_IFC_Submittal Set - Stamped_Part-5 of 5

 

Segment 6_Appx J_HDD IRCP_Pkg4A_IFC_Submittal Set - Stamped

Segment 6_Appx J_HDD IRCP_Pkg4A_IFC_Submittal Set - Stamped_Part-1 of 3

Segment 6_Appx J_HDD IRCP_Pkg4A_IFC_Submittal Set - Stamped_Part-2 of 3

Segment 6_Appx J_HDD IRCP_Pkg4A_IFC_Submittal Set - Stamped_Part-3 of 3

 

Segment 6_Appx K_SPCC_Pkg4A_IFC_Submittal Set

Segment 6_Appx L_SMMP_Pkg4A_IFC-Submittal Set

 

Segment 6_Appx M_WetlandandWaterbodyReport_Pkg4A_IFC_Submittal Set

Segment 6_Appx M_WetlandandWaterbodyReport_Pkg4A_IFC_Submittal Set-Part-1-of-7

Segment 6_Appx M_WetlandandWaterbodyReport_Pkg4A_IFC_Submittal Set-Part-2-of-7

Segment 6_Appx M_WetlandandWaterbodyReport_Pkg4A_IFC_Submittal Set-Part-3-of-7

Segment 6_Appx M_WetlandandWaterbodyReport_Pkg4A_IFC_Submittal Set-Part-4-of-7

Segment 6_Appx M_WetlandandWaterbodyReport_Pkg4A_IFC_Submittal Set-Part-5-of-7

Segment 6_Appx M_WetlandandWaterbodyReport_Pkg4A_IFC_Submittal Set-Part-6-of-7

Segment 6_Appx M_WetlandandWaterbodyReport_Pkg4A_IFC_Submittal Set-Part-7-of-7

 

Segment 6_Appx N_Invasive Species Control Plan_Pkg4A_IFC_Submittal Set

Segment 6 Appx O SCRMP Pkg 4A IFC Submittal Set Public

Segment 6_Appx P_Corrosive Effects Study_Pkg4A_IFC_Submittal Set

Segment 6_Appx Q Cable Ampacity and Thermal Calculations_Pkg4A_IFC_Submittal-Set

Segment 6 Appx R CI Pkg4A IFC Submittal Set Redacted

Segment 6 Appx S Rock Removal Plan Pkg4A IFC Submittal Set

 

Segment 6 Appx T RTE-SSNC REDACTED Pkg4A IFC Submittal Set

Segment 6 Appx T RTE-SSNC REDACTED Pkg4A IFC Submittal Set Part 1-of-3

Segment 6 Appx-T RTE-SSNC REDACTED Pkg4A IFC Submittal Set Part 2-of-3

Segment 6 Appx T RTE-SSNC REDACTED Pkg4A IFC Submittal Set Part 3-of-3

 

 

Segment 7

Narrative for Segment 7 EMCP

 

Appendices for Segment 7 EMCP

Segment 7_Appx A_Agency Correspondence_Pkg4B_IFC_Submittal_Set

Segment 7_Appx B_EMCPFiling Notices_Pkg4B

 

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-1-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-2-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-3-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-4-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-5-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-6-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-7-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-8-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-9-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-10-of-11

Segment 7_Appx C_Plan_and_Profile_Drawings_P4B_IFC_Submittal_Set-Part-11-of-11

 

Segment 7_Appx D_Compliance Crosswalk_Pkg4B_IFC_Submittal Set

Segment 7_Appx E_Deviation Zone Excursion Memo_Pkg4B_IFC_Submittal Set

Segment 7_Appx F_Compliance Assurance Plan_Pkg4B_IFC_Submittal Set

 

Segment 7_Appx G_SWPPP_Pkg4B_IFC_Submittal

Segment 7_Appx G_SWPPP_Pkg4B_IFC_Submittal-Part-1-of-4

Segment 7_Appx G_SWPPP_Pkg4B_IFC_Submittal-Part-2-of-4

Segment 7_Appx G_SWPPP_Pkg4B_IFC_Submittal-Part-3-of-4

Segment 7_Appx G_SWPPP_Pkg4B_IFC_Submittal-Part-4-of-4

 

Segment 7_Appx G1_Temporary_Drainage_IFC_Submittal

Segment 7_Appx H_ ConstructionSafety_Pkg4B_IFC_Submittal Set

Segment 7_Appx I_PublicInvolvementPlan_Pkg4B_IFC_Submittal Set

 

Segment 7_Appx J_HDD DSR_Pkg4B_IFC_Submittal Set

Segment 7_Appx J_HDD DSR_Pkg4B_IFC_Submittal Set-Part-1-of-7

Segment 7_Appx J_HDD DSR_Pkg4B_IFC_Submittal Set-Part-2-of-7

Segment 7_Appx J_HDD DSR_Pkg4B_IFC_Submittal Set-Part-3-of-7

Segment 7_Appx J_HDD DSR_Pkg4B_IFC_Submittal Set-Part-4-of-7

Segment 7_Appx J_HDD DSR_Pkg4B_IFC_Submittal Set-Part-5-of-7

Segment 7_Appx J_HDD DSR_Pkg4B_IFC_Submittal Set-Part-6-of-7

Segment 7_Appx J_HDD DSR_Pkg4B_IFC_Submittal Set-Part-7-of-7

 

Segment 7_Appx K_SPCC_Pkg4B_IFC_Submittal Set

Segment 7_Appx L_SMMP_Pkg4B_IFC_Submittal Set

 

Segment 7_Appx M_WetlandDelinationReport_Pkg4B_IFC_Submittal Set

Segment 7_Appx M_WetlandDelinationReport_Pkg4B_IFC_Submittal Set-Part-1-of-5

Segment 7_Appx M_WetlandDelinationReport_Pkg4B_IFC_Submittal Set-Part-2-of-5

Segment 7_Appx M_WetlandDelinationReport_Pkg4B_IFC_Submittal Set-Part-3-of-5

Segment 7_Appx M_WetlandDelinationReport_Pkg4B_IFC_Submittal Set-Part-4-of-5

Segment 7_Appx M_WetlandDelinationReport_Pkg4B_IFC_Submittal Set-Part-5-of-5

 

Segment 7_Appx N_ Invasive Species Control Plan_Pkg4B_IFC_Submittal Set

Segment 7_Appx O_CRMP_Cultural_Pkg4B_IFC_SubmitalSet_Public

Segment 7_Appx P_Corrosive Effects Study_Pkg4B_IFC_Submittal Set

Segment 7_Appx Q_Cable Ampacity and Thermal Calculations_Pkg4B_IFC_Submittal Set

Segment 7_Appx R_CI_Pkg4B_IFC_Submittal Set_Redacted

Segment 7_Appx S_RockRemovalPlan_Pkg4B_IFC_Submittal Set

 

Segment 7_Appx T_ CHPE_OverlandRTESSNC_REDACTED_Pkg4B_IFC_Submittal Set

Segment 7_Appx T_ CHPE_OverlandRTESSNC_REDACTED_Pkg4B_IFC_Submittal Set-Part-1-of-3

Segment 7_Appx T_ CHPE_OverlandRTESSNC_REDACTED_Pkg4B_IFC_Submittal Set-Part-2-of-3

Segment 7_Appx T_ CHPE_OverlandRTESSNC_REDACTED_Pkg4B_IFC_Submittal Set-Part-3-of-3

 

Segment 7_Appx U_CSXT_RailroadPoliciesandGuidelinesforConstructions_Pkg4B_IFC_Submittal Set

Notice of Change 094

CN 094_HDD 73A_Adjust for NG Transmission_20240613_to dps_Part1

CN 094_HDD 73A_Adjust for NG Transmission_20240613_to dps_Part2

 

Notices of Change 123

CN 123_HDD 89 Adjustment for NG_20240620-0808

 

Notice of Change 141

CN 141_Rotterdam HDD 73 Extension_Part1

CN 141_Rotterdam HDD 73 Extension_Part2

 

Notice of Change 198

CN 198_Indian Fields Trenchless Crossing_20241119-1145_Part1

CN 198_Indian Fields Trenchless Crossing_20241119-1145_Part2

 

Notice of Change 276 

CN 276_Splice 167A Shift_20241101-0925

 

PSC Order Approving segment 8 and 9 EMCP

 

Construction Notice for Segments 8 and 9

221221 Cover Letter Filing-Segment 8 and 9 EMCP

Narrative for Segment 8 EMCP

Narrative for Segment 9 EMCP

 

Appendices for Segment 8 and 9 EMCP

 

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_Submittal 

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-1

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-2

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-3

 

Segment 8 and 9_Appx B_EM&CP Filing Notices

 

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 1 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 2 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 3 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 4 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 5 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 6 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 7 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 8 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 9 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 10 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 11 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 12 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 13 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 14 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 15 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 16 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 17 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 18 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 19 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 20 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 21 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 22 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 23 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 24 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 25 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 26 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 27 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 28 of 28

 

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 1 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 2 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 3 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 4 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 5 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 6 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 7 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 8 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 9 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 10 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 11 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 12 of 13

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 13 of 13

 

Segment 8 and 9_Appx D_BMP Compliance Crosswalk

Segment 8_Appx E_Justification for Deviation Zone Excursions_5A_REV1

Segment 9_Appx E_Justification for Deviation Zone Excursions_5B_Final_REV1

Segment 8 and 9_Appx F_Compliance Assurance Plan

 

Segment 8_Appx G_SWPPP_Pkg5a

Segment 8_Appx G_SWPPP_Pkg5a Part 1 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 2 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 3 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 4 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 5 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 6 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 7 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 8 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 9 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 10 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 11 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 12 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 13 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 14 of 14

 

Segment 9_Appx G_SWPPP_Pkg5b

Segment 9_Appx G_SWPPP_Pkg5b Part 1 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 2 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 3 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 4 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 5 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 6 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 7 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 8 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 9 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 10 of 10

 

Segment 8 and 9_Appx H_ Construction and Safety Policies and Procedures

Segment 8 and 9_Appx I_ Public Involvement Plan

 

Segment 8_Appx J1_HDD BDR_Pkg 5A_IFC

Segment 8_Appx J2_HDD IR PLAN_Pkg 5A_IFC

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-1

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-2

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-3

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-4

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-5

Segment 9_Appx J1_HDD BDR_Pkg5B_IFC

Segment 9_Appx J2_HDD IRR Plan_Pkg5B_IFC

 

Segment 8 and 9_Appx K_SPCC_REV2_OCR

Segment 8 and 9_Appx L_Soil and Materials Management Plan_REV2

 

Segment 8_Appx M_WDR_pkg5A_Rev2_OCR

Segment 8_Appx-M_WDR_pkg5A_Rev2_OCRPart-1-of-16

Segment 8_Appx-M_WDR_pkg5A_Rev2_OCRPart-2-of-16

Segment 8_Appx-M_WDR_pkg5A_Rev2_OCRPart-3-of-16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-4 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-5 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-6 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-7 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-8 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-9 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-10 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-11 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-12 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-13 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-14 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-15 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-16 of 16

 

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-1 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-2 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-3 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-4 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-5 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-6 of 6

 

Segment 8 and 9_Appx N_ Invasive Species Control Plan

Segment 8_Appx O_CRMP_Final_Submittal_Public

Segment 9_Appx O_CRMP_FinalSubmittal_Public

Segment 8 and 9_Appx P_Corrosive Effects Study

Segment 8 and 9_Appx Q_Cable Ampacity and Thermal Calculations

Segment 8_Appx R_CI Consultations_Package 5A__REV2_Redacted

Segment 9_Appx R_CI Consultations_Package 5B__REV2_Redacted

Segment 8_Appx S_Overland Rock Removal Plan

Segment 9_Appx S_Overland Rock Removal Plan

 

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED 

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-1

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-2

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-3

 

Segment 8 and 9_Appx U_CSXT Railroad Policies and Guidelines

Notice of Change 084

CN 084_Seg10 HDD 91 Realignment per NYSDOT Comment_20240416-1630

 

Notice of change 196

CN 196_Leeds Athens Reroute_20241030-0953_Part1

CN 196_Leeds Athens Reroute_20241030-0953_Part2

CN 196_Leeds Athens Reroute_20241030-0953_Part3

CN 196_DeviationZoneExhibit

 

Notice of Change 318

CN 318_Wire Pull 208 Rt 144 N Alignment & Access Revisions_20250312-0645_to tdi OCR

 

PSC Order Segment 10 EMCP Approval

 

Construction Notice for Segment 10

230929 Cover Letter Filing Segment 10 EMCP

Narrative for Segment 10 EMCP

 

Appendices for Segment 10 EMCP

Segment 10_Appx A_Agency Correspondence_Segment 10

Segment 10_Appx B_EMCPFilingNotices

 

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 1 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 2 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 3 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 4 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 5 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 6 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 7 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 8 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 9 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 10 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 11 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 12 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 13 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 14 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 15 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 16 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 17 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 18 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 19 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 20 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 21 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 22 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 23 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 24 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 25 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 26 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 27 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 28 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 29 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 30 of 31

Segment 10_Appx C_Plan and Profile Drawings_Seg10_Pkg 6_IFC_Submittal_230929_Part 31 of 31

 

Segment 10_Appx D_BMP Compliance Crosswalk

Segment 10_Appx E_Justification for Deviation Zone Excursions_Seg10_IFC

Segment 10_Appx F_Compliance Assurance Plan

 

Segment 10_Appx G_SWPPP_Pkg6_IFC

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 1 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 2 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 3 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 4 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 5 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 6 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 7 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 8 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 9 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 10 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 11 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 12 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 13 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 14 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 15 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 16 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 17 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 18 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 19 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 20 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 21 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 22 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 23 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 24 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 25 of 26

Segment 10_Appx G_SWPPP_Pkg6_IFC_Part 26 of 26

 

Segment 10_Appx H_ Construction and Safety Policies and Procedures

Segment 10_Appx I_Public Involvement Plan_Segment 10

 

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal_Part1 of 8

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal_Part2 of 8

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal_Part3 of 8

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal_Part4 of 8

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal_Part5 of 8

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal_Part6 of 8

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal_Part7 of 8

Segment 10_Appx J1_HDD_DSR_IFC Complete_Submittal_Part8 of 8

 

Segment 10_Appx J2_HDD_IRR Plan_IFC Complete_Submittal

Segment 10_Appx K_SPCC_Segment 10

Segment 10_Appx L_Soil and Materials Management Plan_Segment 10

 

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 1 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 2 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 3 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 4 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 5 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 6 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 7 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 8 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 9 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 10 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 11 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 12 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 13 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 14 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 15 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 16 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 17 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 18 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 19 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 20 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 21 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 22 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 23 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 24 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 25 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 26 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 27 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 28 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 29 of 30

Segment 10_Appx M_Wetland and Waterbodies Report_Pkg6_IFC_Part 30 of 30

 

Segment 10_Appx N_ Invasive Species Control Plan

Segment 10_Appx O_SCRMP-Cultural_Redacted

Segment 10_Appx P_Corrosive Effects Study

Segment 10_Appx Q_Cable Ampacity and Thermal Calculations

 

Segment 10_Appx R_Documentation of CI Consultation Having Occurred_Segment 10_REDACTED-Part-1 of 2

Segment 10_Appx R_Documentation of CI Consultation Having Occurred_Segment 10_REDACTED-Part-2 of 2

Segment 10_Appx S_Overland Rock Removal Plan_Segment 10

 

Segment 10_Appx T_CHPE Overland_Environmentally Sensitive Species and Habitats

Segment 10_Appx T_CHPE Overland_Environmentally Sensitive Species and Habitats_REDACTED-Part-1 of 3

Segment 10_Appx T_CHPE Overland_Environmentally Sensitive Species and Habitats_REDACTED-Part-2 of 3_Part1

Segment 10_Appx T_CHPE Overland_Environmentally Sensitive Species and Habitats_REDACTED-Part-2 of 3_Part2

Segment 10_Appx T_CHPE Overland_Environmentally Sensitive Species and Habitats_REDACTED-Part-3 of 3_Part1

Segment 10_Appx T_CHPE Overland_Environmentally Sensitive Species and Habitats_REDACTED-Part-3 of 3_Part2

 

Segment 10_Appx U_CSXT Railroad Policies and Guidelines for Construction of CHPE Project

230330 CHPE Catskill Reroute Amendment Petition with Attachment 1

 

Notice of Change 142

CN 142_HDD 113 Alignment Change_20240716-1510_Part1

CN 142_HDD 113 Alignment Change_20240716-1510_Part2

CN 142_HDD 113 Alignment Change_20240716-1510_Part3

 

PSC Order Approving Segment 11

 

Construction Notice for Segment 11

230327 Cover Letter Filing Segment 11 EMCP

Narrative for Segment 11 EMCP

 

Appendices for Segment 11 EMCP

Segment 11_Appx A_Agency Correspondence_Pkg7A_Final

Segment 11_Appx B_EMCP Filing Notices.pdf

 

Segment 11_Appx C_Design Drawings_Pkg7A_Final

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 1 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 2 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 3 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 4 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 5 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 6 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 7 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 8 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 9 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 10 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 11 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 12 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 13 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 14 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 15 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 16 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 17 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 18 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 19 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 20 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 21 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 22 of 23

Segment 11_Appx C_Plan and Profile Drawings_Pkg 7A_IFC_Submittal Part 23 of 23

 

Segment 11_Appx D_BMP Compliance Crosswalk_Pkg7a_Final

Segment 11_Appx E_ Justification for Deviation Zone Excursions

Segment 11_Appx F_Compliance Assurance Plan

 

Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7A

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 1 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 2 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 3 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 4 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 5 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 6 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 7 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 8 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 9 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 10 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 11 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 12 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 13 of 14

Segment 11_Appx G_SWPPP_Pkg7A_IFC Part 14 of 14

 

Segment 11_Appx H_Construction and Safety Policies and Procedures_Final

Segment 11_Appx I_Public Involvement Plan_Package 7A_IFC_Submittal

 

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final

Segment 11_Appx J_HDD Design Summary Report_Pkg7A_IFC Part 1 of 7

Segment 11_Appx J_HDD Design Summary Report_Pkg7A_IFC Part 2 of 7

Segment 11_Appx J_HDD Design Summary Report_Pkg7A_IFC Part 3 of 7

Segment 11_Appx J_HDD Design Summary Report_Pkg7A_IFC Part 4 of 7

Segment 11_Appx J_HDD Design Summary Report_Pkg7A_IFC Part 5 of 7

Segment 11_Appx J_HDD Design Summary Report_Pkg7A_IFC Part 6 of 7

Segment 11_Appx J_HDD Design Summary Report_Pkg7A_IFC Part 7 of 7

 

Segment 11_Appx J_HDD IR Contingency Plan Report_Pkg7A_IFC

Segment 11_Appx J_HDD IR Contingency Plan Report_Pkg7A_IFC Part 1 of 3

Segment 11_Appx J_HDD IR Contingency Plan Report_Pkg7A_IFC Part 2 of 3

Segment 11_Appx J_HDD IR Contingency Plan Report_Pkg7A_IFC Part 3 of 3

 

Segment 11_Appx K_Spill Prevention Control and Countermeasure Plan_Final

Segment 11_Appx L_Soil and Materials Management Plan_SEG11_IFC

 

Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 1 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 2 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 3 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 4 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 5 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 6 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 7 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 8 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 9 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 10 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 11 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 12 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 13 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 14 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 15 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 16 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 17 of 18

Segment 11_Appx M_Wetland and Waterbody Report_P7A_IFC Part 18 of 18

 

Segment 11_Appx N_ Invasive Species Control Plan_Pkg7a_Final

Segment 11_Appx O_SCRMP_Cultural_DraftFinal_Public

Segment 11_Appx P_Corrosive Effects Study_Pkg7a_Final

Segment 11_Appx Q_Cable Ampacity and Thermal Calculations_Pkg7a_Final

Segment 11_Appx R_CI Consultation_SEG11 IFC - REDACTED

Segment 11_Appx S_ Segment 11 Overland Rock Removal Plan_Final

 

Segment 11_Appx T_CHPE Overland_Sensitive Species and Habitats_REDACTED

Segment 11_Appx T_CHPE Overland_Sensitive Species and Habitats_REDACTED_Part 1 of 3

Segment 11_Appx T_CHPE Overland_Sensitive Species and Habitats_REDACTED_Part 2 of 3

Segment 11_Appx T_CHPE Overland_Sensitive Species and Habitats_REDACTED_Part 3 of 3

 

Segment 11_Appx U_CSXT Railroad Policies and Guidelines for Construction of CHPE Project_Final

Notice of Change 054

CN 054_Segment 12 EMCP_NYSDOT R8 & Third Party Requested Changes_Part 1 of 7

CN 054_Segment 12 EMCP_NYSDOT R8 & Third Party Requested Changes_Part 2 of 7

CN 054_Segment 12 EMCP_NYSDOT R8 & Third Party Requested Changes_Part 3 of 7

CN 054_Segment 12 EMCP_NYSDOT R8 & Third Party Requested Changes_Part 4 of 7

CN 054_Segment 12 EMCP_NYSDOT R8 & Third Party Requested Changes_Part 5 of 7

CN 054_Segment 12 EMCP_NYSDOT R8 & Third Party Requested Changes_Part 6 of 7

CN 054_Segment 12 EMCP_NYSDOT R8 & Third Party Requested Changes_Part 7 of 7

 

PSC Order Approving Segment 12 EMCP 

 

Construction Notice for Segment 12

230428 Cover Letter Filing Segment 12 EMCP

Narrative for Segment 12 EMCP

 

Appendices for segment 12 EMCP

Segment 12_Appx A_Agency Correspondence Segment 12

Segment 12_Appx B_Notices_Segment 12

 

Segment 12_Appx C_Plan and Profile Drawing_Final

Segment 12_Appx C_Plan and Profile Drawing_Final_Part1 of 9

Segment 12_Appx C_Plan and Profile Drawing_Final_Part2 of 9

Segment 12_Appx C_Plan and Profile Drawing_Final_Part3 of 9

Segment 12_Appx C_Plan and Profile Drawing_Final_Part4 of 9

Segment 12_Appx C_Plan and Profile Drawing_Final_Part5 of 9

Segment 12_Appx C_Plan and Profile Drawing_Final_Part6 of 9

Segment 12_Appx C_Plan and Profile Drawing_Final_Part7 of 9

Segment 12_Appx C_Plan and Profile Drawing_Final_Part8 of 9

Segment 12_Appx C_Plan and Profile Drawing_Final_Part9 of 9

 

Segment 12_Appx D_BMP Compliance Crosswalk_Final

Segment-12_Appx-E_Appendix-E-Work-Outside-the-Deviation-Zone_Segment-12

Segment 12_Appx F_Compliance Assurance Plan_Final_Submittal

 

Segment 12_Appx G_SWPPP_Pkg7b

Segment 12_Appx G_SWPPP_Pkg7bPart-1 of 7

Segment 12_Appx G_SWPPP_Pkg7bPart-2 of 7

Segment 12_Appx G_SWPPP_Pkg7bPart-3 of 7

Segment 12_Appx G_SWPPP_Pkg7bPart-4 of 7

Segment 12_Appx G_SWPPP_Pkg7bPart-5 of 7

Segment 12_Appx G_SWPPP_Pkg7bPart-6 of 7

Segment 12_Appx G_SWPPP_Pkg7bPart-7 of 7

 

Segment 12_Appx H_Construction and Safety Policies and Procedures_Final

Segment 12_Appx I_Public Involvement Program and Complaint Resolution Plan_Final

 

Segment 12_Appx J_HDD Design Summary Report_Pkg7B

Segment 12_Appx J_HDD Design Summary Report_Pkg7B_Part1 of 5

Segment 12_Appx J_HDD Design Summary Report_Pkg7B_Part2 of 5

Segment 12_Appx J_HDD Design Summary Report_Pkg7B_Part3 of 5

Segment 12_Appx J_HDD Design Summary Report_Pkg7B_Part4 of 5

Segment 12_Appx J_HDD Design Summary Report_Pkg7B_Part5 of 5

 

Segment 12_Appx K_SPCC Plan_Segment 12_Final

Segment 12_Appx L_Soil and Materials Management Plan_Segment 12_Final

 

Segment 12_Appx M_Wetland and Waterbodies Report_Pkg7B

Segment 12_Appx M_Wetland and Waterbodies Report_Pkg7B_Part1of 3

Segment 12_Appx M_Wetland and Waterbodies Report_Pkg7B_Part2 of 3

Segment 12_Appx M_Wetland and Waterbodies Report_Pkg7B_Part3 of 3

 

Segment 12_Appx N_ Invasive Species Control Plan_Final

Segment 12_Appx O_SCRMP_Cultural_P7B_Public

Segment 12_Appx P_Corrosive Effects Study_Final

Segment 12_Appx Q_Cable Ampacity and Thermal Calculations_Final

Segment 12_Appx R_Documentation of CI Consultation_Segment 12_Final

Segment 12_Appx S_Overland Rock Removal Plan_Segment 12_Final

 

Segment 12_Appx T_CHPE Overland_ESS_REDACTED_Final

Segment 12_Appx T_CHPE Overland_ESS_REDACTED_Final_Part 1 of 3

Segment 12_Appx T_CHPE Overland_ESS_REDACTED_Final_Part 2 of 3

Segment 12_Appx T_CHPE Overland_ESS_REDACTED_Final_Part 3 of 3

Notice of Change 264

CHPE Major Change Notice 264_HDD 134A on Randalls Island_Part1of2

CHPE Major Change Notice 264_HDD 134A on Randalls Island_Part2of2

 

PSC Segment 13to15 Approval Order

 

Construction Notice for Segments 13 to 15

230809 Cover Letter Filing Segments 13 to 15 EMCP

Narrative for Segment 13 to 15 EMCP

 

Appendices for Segment 13 to 15 EMCP

Segment 13to15_Appx A_Agency Correspondence_Segment 13, 14, 15

Segment 13to15_Appx B_EMCPFilingNotices

 

Segment 13to15_Appx C_Plan and Profile Drawings_Pkg 8_IFC 

Segment 13to15_Appx C_Plan and Profile Drawings_Pkg 8_IFC Part-1 of 5

Segment 13to15_Appx C_Plan and Profile Drawings_Pkg 8_IFC Part-2 of 5

Segment 13to15_Appx C_Plan and Profile Drawings_Pkg 8_IFC Part-3 of 5

Segment 13to15_Appx C_Plan and Profile Drawings_Pkg 8_IFC Part-4 of 5

Segment 13to15_Appx C_Plan and Profile Drawings_Pkg 8_IFC Part-5 of 5

 

Segment 13to15_Appx D_Compliance Crosswalk

Segment 13to15_Appx E_Justification for Work Outside the Deviation Zone_Segments 13, 14, 15_IFC

Segment 13to15_Appx F_Compliance Assurance Plan_Final_Submittal

 

Segment 13to15_Appx G_SWPPP_Pkg8_IFC_Submittal

Segment 13to15_Appx G_SWPPP_Pkg8_IFC_Submittal Part-1 of 7

Segment 13to15_Appx G_SWPPP_Pkg8_IFC_Submittal Part-2 of 7

Segment 13to15_Appx G_SWPPP_Pkg8_IFC_Submittal Part-3 of 7

Segment 13to15_Appx G_SWPPP_Pkg8_IFC_Submittal Part-4 of 7

Segment 13to15_Appx G_SWPPP_Pkg8_IFC_Submittal Part-5 of 7

Segment 13to15_Appx G_SWPPP_Pkg8_IFC_Submittal Part-6 of 7

Segment 13to15_Appx G_SWPPP_Pkg8_IFC_Submittal Part-7 of 7

 

Segment 13to15_Appx H_Construction and Safety Policies

Segment 13to15_Appx I_Public Involvement Plan_Revision 4 08.08.2023

Segment 13to15_Appx J1_BDR Plan_Pkg 8_IFC Part-1 of 2

Segment 13to15_Appx J1_BDR Plan_Pkg 8_IFC Part-2 of 2

Segment 13to15_Appx J2_IRR Plan_Pkg 8_IFC

Segment 13to15_Appx K_SPCC_Segment 13, 14, 15

Segment 13to15_Appx L_Soil and Materials Management Plan_Segments 13, 14, and 15_IFC

Segment 13to15_Appx M_Wetland Delineation Report_P8_IFC

Segment 13to15_Appx M-1_Randalls Island Salt Marsh Restoration Plan

Segment 13to15_Appx N_ Invasive Species Control Plan_IFC

Segment 13to15_Appx O_SCRMP_Pkg8_Cultural_IFC_Public

Segment 13to15_Appx P_Corrosive Effects Study_Final

Segment 13to15_Appx Q_Cable Ampacity and Thermal Calculations_Final

Segment 13to15_Appx R_Documentation of CI Consultation_P8_IFC PUBLIC

Segment 13to15_Appx S_Overland Rock Removal Plan_Segment 13,14,15

Segment 13to15_Appx T_CHPE Overland_Environmentally Sensitive Species and Habitats_REDACTED Part-1 of 2

Segment 13to15_Appx T_CHPE Overland_Environmentally Sensitive Species and Habitats_REDACTED Part-2 of 2

PSC Errata Notice for Stony Point Transitional HDD EMCP

PSC Order Approving Stony Point Transitional HDD EMCP

 

Construction Notice for Stony Point HDD

220929 Cover Letter Filing Stony Point Transitional HDD EMCP

Narrative for Stony Point Transitional HDD EMCP

 

Appendices for Segment 16 EMCP

Appendix A - CHPE Stony Point HDD P&P Drawings REV2 2023-02-22 (1of2)

Appendix A - CHPE Stony Point HDD P&P Drawings REV2 2023-02-22 (2of2)

Appendix B - EM&CP Filing Notices

Appendix C - Justification for Deviation Zone Excursions

Appendix D - Compliance Assurance Plan

Appendix E - Documentation of CI Consultation

Appendix F - Installation Manual 02-20-23_p1-p103

Appendix F - Installation Manual 02-20-23_p104-p115

Appendix F - Installation Manual 02-20-23_p116-p117

Appendix F - Installation Manual 02-20-23_p118-p199

Appendix F - Installation Manual 02-20-23_p200-p441

Appendix G - PIP and Complaint Resolution Plan

Appendix H - SWPPP

Appendix I - Waterbody Inventory and Wetland Delineation Report

Appendix J - Invasive Species Control Plan

Appendix K - Corrosive Effects Study

Appendix L - Cable Ampacity and Thermal Calculations

Appendix M - Agency Correspondence

Appendix N - Bald Eagle Reconnaissance Survey Memorandum Redacted

Appendix O - Temp Nighttime Lighting Specs

Appendix P - Tomkins Cove Laydown Area Phase Ia Memorandum

Appendix Q - Unanticipated Cultural Resource Discovery Plan

Appendix R - Cultural Resources Management Plan_REDACTED

Appendix S - Noise Analysis Report

Appendix T - Tomkins Cove Laydown Yard Detailed Layout Plan

PSC Order Approving Three Transitional HDD EMCP

 

Construction Notice for Congers HDD

Construction Notice for Cementon HDD

Construction Notice for Putnam Station HDD

221214 Cover Letter Filing Additional Land-Water Transitional HDDs

Narrative for Additional Land-Water Transitional HDDs EMCP

 

Appendices for Three Transitional HDD EMCP

Appendix A - CHPE 3 HDDs P&P Drawings

Appendix B - EMCP Filing Notices

Appendix C - Justification for Deviation Zone Excursions

Appendix D - Compliance Assurance Plan

Appendix E - Co-Located Infrastructure Documentation

 

Appendix F - HDD Installation Manual

Appendix F - HDD Installation Manual_1 of 3

Appendix F - HDD Installation Manual_2 of 3

Appendix F - HDD Installation Manual_3 of 3

 

Appendix G - PIP and Complain Resolution Plan

Appendix H - Invasive Species Control Plan

 

Appendix I - Putnam Station HDD SWPPP Report

Appendix I - (Part 1 of 5) Putnam Station HDD SWPPP Report

Appendix I - (Part 2 of 5) Putnam Station HDD SWPPP Report

Appendix I - (Part 3 of 5) Cementon HDD SWPPP Report

Appendix I - (Part 4 of 5) Cementon HDD SWPPP Report

Appendix I - (Part 5 of 5) Congers HDD SWPPP Report

 

Appendix J - Cultural Resources Management Plan_Redacted

CHPE_Supplemental CRMP_March 2023_FINAL-Public

 

Appendix K - Wetland Delineation Reports (Part 1 of 2)

Appendix K - Wetland Delineation Reports (Part 2 of 2)

Appendix L - Agency Correspondence

Appendix M - Temp Nighttime Lighting Specs

Appendix N - Corrosive Effects Study

Appendix O - Cable Ampacity and Thermal Calculations

Appendix P - Unanticipated Cultural Resource Discovery Plan

Appendix Q - Tomkins Cove Laydown Yard Detailed Layout Plan

PSC Order Approving Segment 18B EMCP

 

2025 Construction Notice for segment 18B

2024 Construction Notice for segment 18B

240126 Cover Letter Filing Lake Champlain Cable Installation EMCP

Narrative for Segment 18B EMCP

 

Appendices for Segment 18B EMCP 

Seg 18B_Lake Champlain Cable_App 1-A EM&CP Filing Notices

Seg 18B_Lake Champlain Cable_App 1-B Certificate Condition Compliance Matrix

Seg 18B_Lake Champlain Cable_App 1-C Agency and Stakeholder Consult_REDACTED

Seg 18B_Lake Champlain Cable_App 1-D PIP

Seg 18B_Lake Champlain Cable_App 3-A Rev Plan and Profile Drawings_REDACTED_Part1of2

Seg 18B_Lake Champlain Cable_App 3-A Rev Plan and Profile Drawings_REDACTED_Part2of2

Seg 18B_Lake Champlain Cable_App 3-B Justification for Excursions_REDACTED

Seg 18B_Lake Champlain Cable_App 3-C CI Documentation_REDACTED

Seg 18B_Lake Champlain Cable_App 3-D CI Crossing Packages_REDACTED_Part1_ of 3

Seg 18B_Lake Champlain Cable_App 3-D CI Crossing Packages_REDACTED_Part2_ of 3

Seg 18B_Lake Champlain Cable_App 3-D CI Crossing Packages_REDACTED_Part3_of 3

Seg 18B_Lake Champlain Cable_App 3-E Navigational Risk Assessment_REDACTED

Seg 18B_Lake Champlain Cable_App 4-A Methodology Statement for Pre-Lay Grapnel Runs

Seg 18B_Lake Champlain Cable_App 5-A Method Statement for Cable Installation_Part 1_of_4

Seg 18B_Lake Champlain Cable_App 5-A Method Statement for Cable Install_Part 2_of_4

Seg 18B_Lake Champlain Cable_App 5-A Method Statement for Cable Install_Part 3_of_4

Seg 18B_Lake Champlain Cable_App 5-A Method Statement for Cable Install_Part 4_of_4

Seg 18B_Lake Champlain Cable_App 6-A Method for Post-Lay and Remedial Mattress Placement

Seg 18B_Lake Champlain Cable_App 7-A Compliance Assurance Plan

Seg 18B_Lake Champlain Cable_App 7-B Susp. Sediment and Water Quality Monitoring

Seg 18B_Lake Champlain Cable_App 7-C Susp. Sediment Monitoring During Pre-Installation Trials

Seg 18B_Lake Champlain Cable_App 7-D Bathymetry, Sediment Temperature, and Magnetic Field SOP

Seg 18B_Lake Champlain Cable_App 7-E Benthic and Sediment Monitoring SOP

Seg 18B_Lake Champlain Cable_App 7-F Immediate Post Install Inspection Plan

Seg 18B_Lake Champlain Cable_App 8-A Spill Prevention and Control Plan

Seg 18B_Lake Champlain Cable_App 8-B VSQG HWMP

Seg 18B_Lake Champlain Cable_App 8-C Program Health and Safety Plan_Part1_of_3

Seg 18B_Lake Champlain Cable_App 8-C Program Health and Safety Plan_Part2_of_3

Seg 18B_Lake Champlain Cable_App 8-C Program Health and Safety Plan_Part3_of_3

Seg 18B_Lake Champlain Cable_App 8-D_Underwater Cultural Resource Rpt_REDACTED

Seg 18B_Lake Champlain Cable_App 8-E CRMP_Unant. Cult. Discovery Plan_REDACTED

Seg 18B_Lake Champlain Cable_Appx 8-F_SCRMP_REDACTED

Seg 18B_Lake Champlain Cable_App 9-A PWS Plan

Notice of change 306

CHPE Marine Change Notice 306_Hudson River Extension Request

 

PSC Order Granting Navigation Amendment and Approving Segment 19B EMCP

 

2025 Construction Notice for Segment 19B

2024 Construction Notice for segment 19B

240405 Cover Letter Filing Hudson River Cable Installation EMCP

Narrative for Segment 19B EMCP

 

Appendices for Segment 19B EMCP

Hudson Cable Install_Seg 19B EMCP_App 1-A EM&CP Filing Notices

Hudson Cable Install_Seg 19B EMCP_App 1-B Certificate Conditions Compliance Matrix

Hudson Cable Install_Seg 19B EMCP_App 1-C Agency and Stakeholder Consultations_REDACTED

Hudson Cable Install_Seg 19B EMCP_App 1-D Public Involvement Plan

Hudson Cable Install_Seg 19B EMCP_App 3-A Plan and Profile Drawings 2024-05-28 REDACTED

Hudson Cable Install_Seg 19B EMCP_App 3-B Justification for Excursions _REDACTED

Hudson Cable Install_Seg 19B EMCP_App 3-C CI Documentation_REDACTED

 

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 01 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 02 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 03 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 04 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 05 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 06 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 07 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 08 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 09 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 10 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 11 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 12 of 13

Hudson Cable Install_Seg 19B EMCP_App 3-D CI Crossing Packages REDACTED Part 13 of 13

 

Hudson Cable Install_Seg 19B EMCP_App 3-E Navigation Risk Assessment_REDACTED_Part 1 of 2

Hudson Cable Install_Seg 19B EMCP_App 3-E Navigation Risk Assessment_REDACTED_Part 2 of 2

Hudson Cable Install_Seg 19B EMCP_App 5-A Hudson River Cable Installation

Hudson Cable Install_Seg 19B EMCP_App 6-A Methods for Post-Lay and Remedial Mattress

Hudson Cable Install_Seg 19B EMCP_App 7-A Compliance Assurance Plan

Hudson Cable Install_Seg 19B EMCP_App 7-B SS and WQ Monitoring Plan

Hudson Cable Install_Seg 19B EMCP_App 7-C Suspended Sediment Monitoring Reports

Hudson Cable Install_Seg 19B EMCP_App 7-D Bathy Sed Temp and Mag Field SOP

Hudson Cable Install_Seg 19B EMCP_App 7-E Atlantic Sturgeon Pre and Post Energizing SOP

Hudson Cable Install_Seg 19B EMCP_App 7-F Benthic and Sediment SOP

Hudson Cable Install_Seg 19B EMCP_App 7-G Voluntary Pump Study

 

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study_Part1

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study_Part2

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study_Part3

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study_Part4

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study_Part5

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study_Part6

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study_Part7

Hudson Cable Install_Seg 19B EMCP_App 7-H Voluntary Sediment Study_Part8

 

Hudson Cable Install_Seg 19B EMCP_App 7-I Immediate Post Installation Inspection Plan

Hudson Cable Install_Seg 19B EMCP_App 8-A Spill Prevention Control Plan

Hudson Cable Install_Seg 19B EMCP_App 8-B VSQG HWMP

Hudson Cable Install_Seg 19B EMCP_App 8-C Program Health and Safety Plan

Hudson Cable Install_Seg 19B EMCP_App 8-D Cable Install Health and Safety Plan

Hudson Cable Install_Seg 19B EMCP_App 8-E SCRMP_REDACTED

Hudson Cable Install_Seg 19B EMCP_App 8-F Invasive Species Control Plan

Hudson Cable Install_Seg 19B EMCP_App 9-A Bridges REDACTED

Hudson Cable Install_Seg 19B EMCP_App 9-B PWS Protection and Contingency Plan_REDACTED

PSC Order Approving Segment 22 EMCP

 

Construction Notice for Segment 22

230131 Cover Letter Filing Converter Station EMCP

Narrative for Segment 22 EMCP

 

Appendices for Segment 22 EMCP

Appendix A. Agency Correspondence

Appendix B. EM&CP Filing Notices

Appendix C.01. Site Plan - Civil

Appendix C.02. Site Plan - Drainage

Appendix C.03. Site Plan - Pavement

Appendix C.04. Site Plan - Retaining Wall

Appendix C.05. Site Plan - Utilities_Part 1 of 2

Appendix C.05. Site Plan - Utilities_Part 2 of 2

Appendix C.06. Structural Drawings - Site Piles and Foundations

Appendix C.07. Structural Drawings - Service and Converter Station Building Piles & Foundations

Appendix C.08. Structural Drawings - Auxiliary Enclosures Piles & Foundations

Appendix C.09. Structural Drawings - Site

Appendix C.10. Structural Drawings - Converter and Service Building_Part 1 of 2

Appendix C.10. Structural Drawings - Converter and Service Building_Part 2 of 2

Appendix C.11. Structural Drawings - Auxiliary Enclosures


Appendix C.12. Architecture Drawings - Converter and Service Building

Appendix C.12. Architecture Drawings - Converter and Service Building_Part 1 of 4

Appendix C.12. Architecture Drawings - Converter and Service Building_Part 2 of 4

Appendix C.12. Architecture Drawings - Converter and Service Building_Part 3 of 4

Appendix C.12. Architecture Drawings - Converter and Service Building_Part 4 of 4

 

Appendix C.13. Architecture Drawings - Auxiliary Enclosures

Appendix C.14. Energy Package - Converter and Service Building

Appendix C.15. Energy Package - Auxiliary Enclosures

 

Appendix C.16. Electrical Drawings

Appendix C.16. Electrical Drawings_Part 1 of 6

Appendix C.16. Electrical Drawings_Part 2 of 6

Appendix C.16. Electrical Drawings_Part 3 of 6

Appendix C.16. Electrical Drawings_Part 4 of 6

Appendix C.16. Electrical Drawings_Part 5 of 6

Appendix C.16. Electrical Drawings_Part 6 of 6

 

Appendix C.17. Fire Protection Drawings - Clean Ageny Fire Extinguishing

Appendix C.18. Fire Protection Drawings - Fire Alarm

Appendix C.19. Fire Protection Drawings - Water-Based Fire Suppression

Appendix C.20. Mechanical Drawings - Converter and Service Building

Appendix C.21. Mechanical Drawings - Auxiliary Enclosures

Appendix C.22. Plumbing Drawings - Site

Appendix C.23. Plumbing Drawings - Service Building

Appendix C.24. Zoning Package

Appendix C.25. Communications Package_Part 1 of 2

Appendix C.25. Communications Package_Part 2 of 2

Appendix C.26. FDNY Package

Appendix D. BMP Crosswalk Astoria Converter Station EM&CP

Appendix E. Compliance Assurance Plan

 

Appendix F. Stormwater Pollution Prevention Plan (SWPPP)

Appendix F. Stormwater Pollution Prevention Plann (SWPPP)_Part 1 of 3

Appendix F. Stormwater Pollution Prevention Plann (SWPPP)_Part 2 of 3

Appendix F. Stormwater Pollution Prevention Plann (SWPPP)_Part 3 of 3


Appendix G. Construction and Safety Policies and Procedures

Appendix H. Public Involvement and Complaint Resolution Plan

Appendix I. Spill Prevention Control and Countermeasures (SPCC)

Appendix J. Soil and Materials Management Plan

Appendix K. Invasive Species Control Plan

Appendix L. Cultural Resources Management Plan_Public-Redacted

Appendix M. Documentation of CI Consultation Occurred_Public-Redacted

Appendix N. Noise Assessment Report

PSC Order Approving Segment 23 EMCP

 

Construction Notice for Segment 23

240212 Cover Letter Filing Astoria Rainey Cable EMCP

Narrative for Segment 23 EMCP

 

Appendices for Segment 23 EMCP

Segment 23 ARC_Appx A - Agency Correspondence

Segment 23 ARC_Appx A Supplement_SHPO Response on AstoriaRaineySeg23

Segment 23 ARC_Appx B_EMCP Notices

 

Segment 23 ARC_Appx C - CS001 to CS007_

Segment 23 ARC_Appx C - CS001 to CS007_Part 1 of 14_Redacted

Segment 23 ARC_Appx C - CS008 to CS009_Part 2 of 14_Redacted

Segment 23 ARC_Appx C - CU101 to CU119_Part 3 of 14_Redacted

Segment 23 ARC_Appx C - CU120 to CU136_Part 4 of 14_Redacted

Segment 23 ARC_Appx C - CU137 to CU151_Part 5 of 14_Redacted

Segment 23 ARC_Appx C - CU152 to CU202_Part 6 of 14_Redacted

Segment 23 ARC_Appx C - CS501 to CS515_Part 7 of 14_Redacted

Segment 23 ARC_Appx C - CU401 to CU405_Part 8 of 14_Redacted

Segment 23 ARC_Appx C - K001 to K109_Part 9 of 14

Segment 23 ARC_Appx C - K110 to K303_Part 10 of 14

Segment 23 ARC_Appx C - CU301 to CU311_Part 11 of 14_Redacted

Segment 23 ARC_Appx C - CU311 to CU313_Part 12 of 14_Redacted

Segment 23 ARC_Appx C - CU314 to CU501_Part 13 of 14_Redacted

Segment 23 ARC_Appx C - V-EX101 to V-EX104_Part 14 of 14_Redacted

 

Segment 23 ARC_Appx D EM_CP Crosswalk BMPs Final

Segment 23 ARC_Appx E Compliance Assurance Plan (FINAL)

Segment 23 ARC_Appx F_SWPPPFinal Corrected_04-03-2024

Segment 23 ARC_Appx G - CHPE LLC-Astoria -ARC Safe Work Plan

Segment 23 ARC_Appx H_Public Involvement Plan

Segment 23 ARC_Appx I SPCC PlanFinal

Segment 23 ARC_Appx J Soils and Materials Management Plan

Segment 23 ARC_Appx K _SCRMP_Redacted

Segment 23 ARC_Appx L - Corrosive Effects Study_Redacted

Segment 23 ARC_Appx M - Cable Ampacity, Thermal Calculations, and EMF_Part 1 of 2_Redacted

Segment 23 ARC_Appx M - Cable Ampacity, Thermal Calculations, and EMF_Part 2 of 2_Redacted

Segment 23 ARC_Appx N Doc of CI Consultation Final_Part 1_of 2_Redacted

Segment 23 ARC_Appx N Doc of CI Consultation Final_Part 2_of 2_Redacted

Segment 23 ARC_Supplement to Appx N Final 2024-03-26_Redacted

Segment 23 ARC_Appx O RTE and Sign Nat Comm_redacted

Segment 23 ARC_Appx P_ARC Cost Estimate_Redacted