Environmental Management & Construction Plan

Point of Contact

Molly Hollister – CHPE Construction Representative

WSP USA, One Pennsylvania Plaza, New York, New York 10119

Construction Hotline & Email

1-800-991-CHPE (2473)

publicoutreach@chpexpress.com

Construction Comments and Questions Form

Temporary Laydown Yards EM&CP 11/17/22

221117 Cover Letter Filing Temporary Laydown Yard EMCP
221117 Cover Letter Filing Temporary Laydown Yard EMCP.pdf

Appendix A. Agency Correspondence
Appendix A. Agency Correspondence.pdf

Appendix B. EM&CP Filing Notices
Appendix B. EM&CP Filing Notices.pdf

Appendix C. Laydown Yard Drawings
Appendix C. Laydown Yard Drawings.pdf

Appendix D. Crosswalk
Appendix D. Crosswalk.pdf

Appendix E. Justification for Excursions from the Deviation Zone
Appendix E. Justification for Excursions from the Deviation Zone.pdf

Appendix F. Compliance Assurance Plan_Rev.4
Appendix F. Compliance Assurance Plan_Rev.4.pdf

Appendix G. Stormwater Polution Prevention Plan
Appendix G. Stormwater Polution Prevention Plan.pdf

Appendix G.1 SWPPP – Fort Edward Yard
Appendix G.1 SWPPP – Fort Edward Yard.pdf

Appendix G.2 SWPPP – Bethlehem Yard
Appendix G.2 SWPPP – Bethlehem Yard.pdf

Appendix G.3 SWPPP – Coxsackie Yard
Appendix G.3 SWPPP – Coxsackie Yard.pdf

Appendix H. Construction and Safety Policies and Procedures
Appendix H. Construction and Safety Policies and Procedures.pdf

Appendix I. Public Involvement and Complaint Resolution Plan
Appendix I. Public Involvement and Complaint Resolution Plan.pdf

Appendix J. HDD Preliminary Site Investigation and Planning Report & IRR Plan
Appendix J. HDD Preliminary Site Investigation and Planning Report & IRR Plan.pdf

Appendix K. SPCC
Appendix K. SPCC.pdf

Appendix L. Soil and Materials Management Plan
Appendix L. Soil and Materials Management Plan.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report
Appendix M. Waterbody Inventory and Wetland Delineation Report.pdf

Appendix N. Invasive Species Control Plan
Appendix N. Invasive Species Control Plan.pdf

Appendix O. CRMP for Laydown Yards_REDACTED
Appendix O. CRMP for Laydown Yards_REDACTED.pdf

Appendix P. Corrosive Effects Study
Appendix P. Corrosive Effects Study.pdf

Appendix Q. Cable Ampacity and Thermal Calculations
Appendix Q. Cable Ampacity and Thermal Calculations.pdf

Appendix R. Documentation of CI Constultations
Appendix R. Documentation of CI Constultations.pdf

Appendix S. Overland Rock Removal Plan
Appendix S. Overland Rock Removal Plan.pdf

Appendix T. Rare Threatened and Endangered Species Documentation_REDACTED
Appendix T. Rare Threatened and Endangered Species Documentation_REDACTED.pdf

CHPE Laydown Yards EM&CP Narrative
CHPE Laydown Yards EM&CP Narrative.pdf

General Stakeholder Notice of Submission of EMCP
General Stakeholder Notice of Submission of EMCP.pdf

Notice of Submission of Temporary Laydown Yard EM&CP For the Champlain Hudson Power Express Line

Notice of Submission of Temporary Laydown Yard EM&CP For the Champlain Hudson Power Express Line

Order Approving Segments 1 & 2 EM&CP – 10/13/2022

Order Approving Segment 1 and 2 EM&CP

EM&CP Stony Point Transitional HDD – 9/29/2022

Cover Letter Filing Stony Point Transitional HDD EMCP

Cover Letter Filing Stony Point Transitional HDD EMCP

EM&CP Stony Point Transitional HDD Narrative

EM&CP Stony Point Transitional HDD Narrative

Appendix A – Plan and Profile Drawings

Appendix A – Plan and Profile Drawings

Appendix B – EM&CP Filing Notices

Appendix B – EM&CP Filing Notices

Appendix C – Justification for Deviation Zone Excursions

Appendix C – Justification for Deviation Zone Excursions

Appendix D – Compliance Assurance Plan-Public

Appendix D – Compliance Assurance Plan-Public

Appendix E – Documentation of CI Consultations

Appendix E – Documentation of CI Consultations

Appendix F – HDD Installation Manual

Appendix G – Public Involvement and Complaint Resolution Plan

Appendix G – Public Involvement and Complaint Resolution Plan

Appendix H – SWPPP

Appendix H – SWPPP

Appendix I – Waterbody Inventory and Wetland Delineation Report

Appendix I – Waterbody Inventory and Wetland Delineation Report

Appendix J – Invasive Species Control Plan

Appendix J – Invasive Species Control Plan

Appendix K – Corrosive Effects Study (June 2022)

Appendix K – Corrosive Effects Study (June 2022)

Appendix L – Cable Ampacity and Thermal Calculations (June 2022)

Appendix L – Cable Ampacity and Thermal Calculations. (June 2022)pdf

Appendix M – Agency Correspondence

Appendix M – Agency Correspondence

EM&CP Segment 1 and 2 Revised – 9/21/2022

Cover Letter Filing Revised Segment 1 and 2 EMCP

220921 Cover Letter Filing Revised Segment 1 and 2 EMCP

Environmental Management and Construction Plan Narrative – Segments 1 and 2

Environmental Management and Construction Plan Narrative – Segments 1 and 2_REV1

Confidentiality Request for Revised Appendix O

220921 Confidentiality Request for Revised Appendix O

Appendix A. Agency Correspondence

Appendix A. Agency Correspondence_REV1

Appendix B. EM&CP Filing Notices

Appendix B. EM&CP Filing Notices

Appendix C. Plan and Profiles, ESC, MPT

Appendix D. Compliance Crosswalk

Appendix D. Compliance Crosswalk_REV1

Appendix E. Work Outside the Deviation Zone

Appendix E. Work Outside the Deviation Zone_REV1

Appendix F. Compliance Assurance Plan

Appendix F. Compliance Assurance Plan_REV1

Appendix G. Stormwater Pollution Prevention Plan

Appendix H. Construction and Safety Policies and Procedures

Appendix H. Construction and Safety Policies and Procedures_REV1

Appendix I. Public Involvement and Complaint Resolution Plan

Appendix I. Public Involvement and Complaint Resolution Plan_REV1

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan

Appendix K. Spill Prevention Control and Countermeasures Plan

Appendix K. Spill Prevention Control and Countermeasures Plan_REV1

Appendix L. Soil and Materials Management Plan

Appendix L. Soil and Materials Management Plan_REV1

Appendix M. Waterbody Inventory and Wetland Delineation Report

Appendix N. Invasive Species Control Plan

Appendix N. Invasive Species Control Plan_REV1

Appendix O. Cultural Resources Management Plan

Appendix O. Cultural Resources Management Plan- REDACTED_REV2

Appendix P. Capacity Ampacity and Thermal Calculations

Appendix P. Capacity Ampacity and Thermal Calculations

Appendix Q. Corrosive Effects Study

Appendix Q. Corrosive Effects Study

Appendix R. Documentation of CI Consultation Occurred

Appendix R. Documentation of CI Consultation Occurred_REV1

Appendix S. Overland Rock Removal Plan

Appendix S. Overland Rock Removal Plan

EM&CP Filing Segment 1 and 2 – 4/15/2022

EM&CP Cover Letter Filing Segment 1 & 2

220415-Cover-Letter-Filing-Segment-1-and-2-EMCP.pdf

CHPE Segment 1 & 2 EM&CP Narrative

220415_CHPE-Segment-1-and-2-EMCP-Narrative.pdf

Confidentiality Request for Appendix O

220415-Confidentiality-Request-for-Appendix-O.pdf

Appendix A. Agency Correspondence

Appendix-A.-Agency-Correspondence.pdf

Appendix B. EM&CP Filing Notices

Appendix-B.-EMCP-Filing-Notices-1.pdf

Appendix C. Plan and Profile Drawings

Appendix D. EM&CP Crosswalk

Appendix-D.-EMCP-Crosswalk.pdf

Appendix E. Justification for Excursions Outside the Deviation Zone

Appendix-E.-Justification-for-Excursions-Outside-the-Deviation-Zone.pdf

Appendix F. Compliance Assurance Plan

Appendix-F.-Compliance-Assurance-Plan.pdf

Appendix G. Stormwater Pollution Prevention Plan

Appendix H. Construction & Safety Policies & Procedures

Appendix-H.-Construction-and-Safety-Policies-and-Procedures.pdf

Appendix I. Public Involvement Plan & Complaint Resolution Plan

Appendix-I.-Public-Involvement-Plan-and-Complaint-Resolution-Plan.pdf

Appendix J. HDD Preliminary Site Investigation & Planning Report & Inadvertent Release & Recover Plan (HDD)

Appendix K. Spill Prevention Control & Countermeasures Plan

Appendix-K.-Spill-Prevention-Control-and-Countermeasures-Plan-1.pdf

Appendix L. Soil Management Plan

Appendix-L.-Soil-Management-Plan.pdf

Appendix M. Waterbody & Wetland Inventory & Delineation Report

Appendix N. Invasive Species Control Plan

Appendix-N.-Invasive-Species-Control-Plan-1.pdf

Appendix O. Cultural Resources Management Plan

Appendix-O.-Cultural-Resources-Management-Plan_Redacted-Filing.pdf

Appendix P. Corrosive Effects Study

Appendix-P.-Corrosive-Effects-Study.pdf

Appendix Q. Cable Ampacity & Thermal Calculations

Appendix-Q.-Cable-Ampacity-and-Thermal-Calculations.pdf

Appendix R. Documentation of CI Consultation Occurred

Appendix-R.-Documentation-of-CI-Consultation-Occurred.pdf

Notice of Submission of Environmental Management & Construction Plan for Champlain Hudson Power Express