EM&CP – Test preview

Point of Contact

Molly Hollister - CHPE Construction Representative

WSP USA, One Pennsylvania Plaza, New York, New York 10119

Construction Hotline & Email

1-800-991-CHPE (2473)

publicoutreach@chpexpress.com

Construction Comments and Questions Form

Approved Filings




CP Filing Segment 1 and 2 - 4/15/2022

CHPE Notice for Construction Segments 1 and 2 Final.pdf
CHPE Notice for Construction Segments 1 and 2 Final.pdf

Environmental Management and Construction Plan Narrative - Segments 1 and 2_REV1.pdf
Environmental Management and Construction Plan Narrative - Segments 1 and 2_REV1.pdf

LNTP for Ryder Road Laydown.pdf
LNTP for Ryder Road Laydown.pdf

NTP For Segments 1 and 2.pdf
NTP For Segments 1 and 2.pdf

PSC Errata Notice for Segment 1 and 2 EMCP.pdf
PSC Errata Notice for Segment 1 and 2 EMCP.pdf

PSC Order Approving Segments 1 and 2 EMCP.pdf
PSC Order Approving Segments 1 and 2 EMCP.pdf

Appendix A. Agency Correspondence_REV1.pdf
Appendix A. Agency Correspondence_REV1.pdf

Appendix B. EM&CP Filing Notices.pdf
Appendix B. EM&CP Filing Notices.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part1of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part1of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part2of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part2of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part3of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part3of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part4of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part4of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part5of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part5of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part6of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part6of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part7of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part7of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part8of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part8of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part9of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part9of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part10of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part10of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part11of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part11of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part12of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part12of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part13of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part13of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part14of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part14of15.pdf

Appendix C. Plan and Profiles, ESC, MPT_REV1_part15of15.pdf
Appendix C. Plan and Profiles, ESC, MPT_REV1_part15of15.pdf

Appendix D. Compliance Crosswalk_REV1.pdf
Appendix D. Compliance Crosswalk_REV1.pdf

Appendix E. Work Outside the Deviation Zone_REV1.pdf
Appendix E. Work Outside the Deviation Zone_REV1.pdf

Appendix F. Compliance Assurance Plan_REV1.pdf
Appendix F. Compliance Assurance Plan_REV1.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part1of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part1of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part2of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part2of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part3of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part3of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part4of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part4of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part5of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part5of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part6of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part6of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part7of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part7of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part8of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part8of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part9of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part9of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part10of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part10of11.pdf

Appendix G. Stormwater Pollution Prevention Plan_REV1_part11of11.pdf
Appendix G. Stormwater Pollution Prevention Plan_REV1_part11of11.pdf

Appendix H. Construction and Safety Policies and Procedures_REV1.pdf
Appendix H. Construction and Safety Policies and Procedures_REV1.pdf

Appendix I. Public Involvement and Complaint Resolution Plan_REV1.pdf
Appendix I. Public Involvement and Complaint Resolution Plan_REV1.pdf

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part1of8.pdf
Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part1of8.pdf

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part2of8.pdf
Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part2of8.pdf

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part3of8.pdf
Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part3of8.pdf

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part4of8.pdf
Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part4of8.pdf

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part5of8.pdf
Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part5of8.pdf

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part6of8.pdf
Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part6of8.pdf

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part7of8.pdf
Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part7of8.pdf

Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part8of8.pdf
Appendix J. HDD Prelim Site Inv and Inadvertent Release and Contingency Plan_REV1_part8of8.pdf

Appendix K. Spill Prevention Control and Countermeasures Plan_REV1.pdf
Appendix K. Spill Prevention Control and Countermeasures Plan_REV1.pdf

Appendix L. Soil and Materials Management Plan_REV1.pdf
Appendix L. Soil and Materials Management Plan_REV1.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part1of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part1of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part2of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part2of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part3of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part3of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part4of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part4of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part5of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part5of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part6of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part6of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part7of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part7of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part8of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part8of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part9of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part9of10.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part10of10.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV1_part10of10.pdf

Appendix N. Invasive Species Control Plan_REV1.pdf
Appendix N. Invasive Species Control Plan_REV1.pdf

Appendix O-CRMP 9-30-22_Redacted.pdf
Appendix O-CRMP 9-30-22_Redacted.pdf

Appendix P. Capacity Ampacity and Thermal Calculations.pdf
Appendix P. Capacity Ampacity and Thermal Calculations.pdf

Appendix Q. Corrosive Effects Study.pdf
Appendix Q. Corrosive Effects Study.pdf

Appendix R. Documentation of CI Consultation Occurred_REV1.pdf
Appendix R. Documentation of CI Consultation Occurred_REV1.pdf

Appendix S - Segment 1 and 2 CHPE Overland Rock Removal Plan_REV1.pdf
Appendix S - Segment 1 and 2 CHPE Overland Rock Removal Plan_REV1.pdf




CHPE Notice for Construction of Temporary Laydown Yard Segment.pdf
CHPE Notice for Construction of Temporary Laydown Yard Segment.pdf

LNTP-for-Athens-Coxsackie-Laydown-Yard.pdf
LNTP-for-Athens-Coxsackie-Laydown-Yard.pdf

LNTP For Fort Edward Yard.pdf
LNTP For Fort Edward Yard.pdf

PSC Order Approving Laydown Yards EMCP.pdf
PSC Order Approving Laydown Yards EMCP.pdf

2023_01_25 Laydown Yard EMCP Narrative_REV 1.pdf
2023_01_25 Laydown Yard EMCP Narrative_REV 1.pdf

Appendix A. Agency Correspondence.pdf
Appendix A. Agency Correspondence.pdf

Appendix B. EM&CP Filing Notices.pdf
Appendix B. EM&CP Filing Notices.pdf

Appendix C - Plan and Profiles, ESC, MPT_REV 1.pdf
Appendix C - Plan and Profiles, ESC, MPT_REV 1.pdf

Appendix D. Crosswalk.pdf
Appendix D. Crosswalk.pdf

Appendix E. Justification for Excursions from the Deviation Zone.pdf
Appendix E. Justification for Excursions from the Deviation Zone.pdf

Appendix F. Compliance Assurance Plan_Rev.4.pdf
Appendix F. Compliance Assurance Plan_Rev.4.pdf

Appendix G.1 SWPPP - Fort Edward Yard_REV 1.pdf
Appendix G.1 SWPPP - Fort Edward Yard_REV 1.pdf

Appendix G.2 SWPPP - Bethlehem Yard_REV 1.pdf
Appendix G.2 SWPPP - Bethlehem Yard_REV 1.pdf

Appendix G.3 SWPPP - Coxsackie Yard_REV1.pdf
Appendix G.3 SWPPP - Coxsackie Yard_REV1.pdf

Appendix H. Construction and Safety Policies and Procedures.pdf
Appendix H. Construction and Safety Policies and Procedures.pdf

Appendix I. Public Involvement and Complaint Resolution Plan.pdf
Appendix I. Public Involvement and Complaint Resolution Plan.pdf

Appendix J. HDD Preliminary Site Investigation and Planning Report & IRR Plan.pdf
Appendix J. HDD Preliminary Site Investigation and Planning Report & IRR Plan.pdf

Appendix K. SPCC_REV 1.pdf
Appendix K. SPCC_REV 1.pdf

Appendix K. SPCC.pdf
Appendix K. SPCC.pdf

Appendix L. Soil and Materials Management Plan.pdf
Appendix L. Soil and Materials Management Plan.pdf

Appendix M. Waterbody Inventory and Wetland Delineation Report_REV 1.pdf
Appendix M. Waterbody Inventory and Wetland Delineation Report_REV 1.pdf

Appendix N. Invasive Species Control Plan.pdf
Appendix N. Invasive Species Control Plan.pdf

Appendix O. CRMP redacted_REV1.pdf
Appendix O. CRMP redacted_REV1.pdf

Appendix P. Corrosive Effects Study.pdf
Appendix P. Corrosive Effects Study.pdf

Appendix Q. Cable Ampacity and Thermal Calculations.pdf
Appendix Q. Cable Ampacity and Thermal Calculations.pdf

Appendix R. Documentation of CI Consultations.pdf
Appendix R. Documentation of CI Consultations.pdf

Appendix S. Overland Rock Removal Plan.pdf
Appendix S. Overland Rock Removal Plan.pdf

Appendix T. Rare Threatened and Endangered Species Documentation_REDACTED.pdf
Appendix T. Rare Threatened and Endangered Species Documentation_REDACTED.pdf




PSC Order Approving Stony Point EMCP.pdf
PSC Order Approving Stony Point EMCP.pdf

Narrative - EM&CP Stony Point Transitional HDD.pdf
Narrative - EM&CP Stony Point Transitional HDD.pdf

PSC Errata Letter on Nighttime Construction.pdf
PSC Errata Letter on Nighttime Construction.pdf

Appendix A - CHPE Stony Point HDD P&P Drawings REV2 2023-02-22 (1of2).pdf
Appendix A - CHPE Stony Point HDD P&P Drawings REV2 2023-02-22 (1of2).pdf

Appendix A - CHPE Stony Point HDD P&P Drawings REV2 2023-02-22 (2of2).pdf
Appendix A - CHPE Stony Point HDD P&P Drawings REV2 2023-02-22 (2of2).pdf

Appendix B - EM&CP Filing Notices.pdf
Appendix B - EM&CP Filing Notices.pdf

Appendix C - Justification for Deviation Zone Excursions.pdf
Appendix C - Justification for Deviation Zone Excursions.pdf

Appendix D - Compliance Assurance Plan.pdf
Appendix D - Compliance Assurance Plan.pdf

Appendix E - Documentation of CI Consultation.pdf
Appendix E - Documentation of CI Consultation.pdf

Appendix F - Installation Manual 02-20-23_p1-p103.pdf
Appendix F - Installation Manual 02-20-23_p1-p103.pdf

Appendix F - Installation Manual 02-20-23_p104-p115.pdf
Appendix F - Installation Manual 02-20-23_p104-p115.pdf

Appendix F - Installation Manual 02-20-23_p116-p117.pdf
Appendix F - Installation Manual 02-20-23_p116-p117.pdf

Appendix F - Installation Manual 02-20-23_p118-p199.pdf
Appendix F - Installation Manual 02-20-23_p118-p199.pdf

Appendix F - Installation Manual 02-20-23_p200-p441.pdf
Appendix F - Installation Manual 02-20-23_p200-p441.pdf

Appendix G - PIP and Complaint Resolution Plan.pdf
Appendix G - PIP and Complaint Resolution Plan.pdf

Appendix H - SWPPP.pdf
Appendix H - SWPPP.pdf

Appendix I - Waterbody Inventory and Wetland Delineation Report.pdf
Appendix I - Waterbody Inventory and Wetland Delineation Report.pdf

Appendix J - Invasive Species Control Plan.pdf
Appendix J - Invasive Species Control Plan.pdf

Appendix K - Corrosive Effects Study.pdf
Appendix K - Corrosive Effects Study.pdf

Appendix L - Cable Ampacity and Thermal Calculations.pdf
Appendix L - Cable Ampacity and Thermal Calculations.pdf

Appendix M - Agency Correspondence.pdf
Appendix M - Agency Correspondence.pdf

Appendix N - Bald Eagle Reconnaissance Survey Memorandum_Redacted.pdf
Appendix N - Bald Eagle Reconnaissance Survey Memorandum_Redacted.pdf

Appendix O - Temp Nighttime Lighting Specs.pdf
Appendix O - Temp Nighttime Lighting Specs.pdf

Appendix P - Tomkins Cove Laydown Area Phase Ia Memorandum.pdf
Appendix P - Tomkins Cove Laydown Area Phase Ia Memorandum.pdf

Appendix Q - Unanticipated Cultural Resource Discovery Plan.pdf
Appendix Q - Unanticipated Cultural Resource Discovery Plan.pdf

Appendix R - Cultural Resources Management Plan_REDACTED.pdf
Appendix R - Cultural Resources Management Plan_REDACTED.pdf

Appendix S - Noise Analysis Report.pdf
Appendix S - Noise Analysis Report.pdf

Appendix T - Tomkins Cove Laydown Yard Detailed Layout Plan.pdf
Appendix T - Tomkins Cove Laydown Yard Detailed Layout Plan.pdf

Pending Approval




Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-14.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-14.pdf

230330 CHPE Catskill Reroute Amendment Petition with Attachment 1.pdf
230330 CHPE Catskill Reroute Amendment Petition with Attachment 1.pdf

230330 Cover Letter Filing Additional Segment 11 EMCP Documents and Petition.pdf
230330 Cover Letter Filing Additional Segment 11 EMCP Documents and Petition.pdf

Segment 11_Appx B_EMCP Filing Notices.pdf
Segment 11_Appx B_EMCP Filing Notices.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-1.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-1.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-2.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-2.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-3.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-3.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-4.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-4.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-5.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-5.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-6.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-6.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-7.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-7.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-8.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-8.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-9.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-9.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-10.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-10.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-11.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-11.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-12.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-12.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-13.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-13.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-14.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-14.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-15.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-15.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-16.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-16.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-17.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-17.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-18.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-18.pdf

Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-19.pdf
Segment 11_Appx C_Design Drawings_Pkg7A_Final_Part-19.pdf

Segment 11_Appx D_BMP Compliance Crosswalk_Pkg7a_Final.pdf
Segment 11_Appx D_BMP Compliance Crosswalk_Pkg7a_Final.pdf

Segment 11_Appx E_Segment 11 Justification for Deviation Zone Excursions.pdf
Segment 11_Appx E_Segment 11 Justification for Deviation Zone Excursions.pdf

Segment 11_Appx F_Compliance Assurance Plan.pdf
Segment 11_Appx F_Compliance Assurance Plan.pdf

Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 1 of 6.pdf
Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 1 of 6.pdf

Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 2 of 6.pdf
Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 2 of 6.pdf

Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 3 of 6.pdf
Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 3 of 6.pdf

Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 4 of 6.pdf
Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 4 of 6.pdf

Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 5 of 6.pdf
Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 5 of 6.pdf

Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 6 of 6.pdf
Segment 11_Appx G_Stormwater Pollution Prevention Plan_Pkg7a_Final_Part 6 of 6.pdf

Segment 11_Appx H_Construction and Safety Policies and Procedures_Final.pdf
Segment 11_Appx H_Construction and Safety Policies and Procedures_Final.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 1 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 1 of 9.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 2 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 2 of 9.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 3 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 3 of 9.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 4 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 4 of 9.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 5 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 5 of 9.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 6 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 6 of 9.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 7 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 7 of 9.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 8 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 8 of 9.pdf

Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 9 of 9.pdf
Segment 11_Appx J_HDD Design Summary Repor_Pkg7a_Final_Part 9 of 9.pdf

Segment 11_Appx K_Spill Prevention Control and Countermeasure Plan_Final.pdf
Segment 11_Appx K_Spill Prevention Control and Countermeasure Plan_Final.pdf

Segment 11_Appx L_Soil and Materials Management Plan_Segment 11_Final.pdf
Segment 11_Appx L_Soil and Materials Management Plan_Segment 11_Final.pdf

Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet_Part 1 of 4.pdf
Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet_Part 1 of 4.pdf

Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet_Part 2 of 4.pdf
Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet_Part 2 of 4.pdf

Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet_Part 3 of 4.pdf
Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet_Part 3 of 4.pdf

Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet_Part 4 of 4.pdf
Segment 11_Appx M_Wetland Delineation Report_P7A_Final_CleanSet_Part 4 of 4.pdf

Segment 11_Appx N_ Invasive Species Control Plan_Pkg7a_Final.pdf
Segment 11_Appx N_ Invasive Species Control Plan_Pkg7a_Final.pdf

Segment 11_Appx P_Corrosive Effects Study_Pkg7a_Final.pdf
Segment 11_Appx P_Corrosive Effects Study_Pkg7a_Final.pdf

Segment 11_Appx Q_Cable Ampacity and Thermal Calculations_Pkg7a_Final.pdf
Segment 11_Appx Q_Cable Ampacity and Thermal Calculations_Pkg7a_Final.pdf

Segment 11_Appx R_Documentation of CI Consultation Having Occurred_Package 7A_Final.pdf
Segment 11_Appx R_Documentation of CI Consultation Having Occurred_Package 7A_Final.pdf

Segment 11_Appx S_ Segment 11 Overland Rock Removal Plan_Final.pdf
Segment 11_Appx S_ Segment 11 Overland Rock Removal Plan_Final.pdf

Segment 11_Appx U_CSXT Railroad Policies and Guidelines for Construction of CHPE Project_Final.pdf
Segment 11_Appx U_CSXT Railroad Policies and Guidelines for Construction of CHPE Project_Final.pdf

Segment 11_EM&CP Narrative_Package 7A_Final_Submittal.pdf
Segment 11_EM&CP Narrative_Package 7A_Final_Submittal.pdf




230404 Cover Letter Filing Lake Champlain Pre Lay Mattressing EMCP.pdf
230404 Cover Letter Filing Lake Champlain Pre Lay Mattressing EMCP.pdf

230404 Lake Champlain Pre Lay Mattressing Mattressing EM&CP Narrative_Redacted.pdf
230404 Lake Champlain Pre Lay Mattressing Mattressing EM&CP Narrative_Redacted.pdf

230404 Request for Confidential Protection of Narrative and Appendices A and D.pdf
230404 Request for Confidential Protection of Narrative and Appendices A and D.pdf

Appendix A - Pre-Lay Mattress Location Drawings-Redacted.pdf
Appendix A - Pre-Lay Mattress Location Drawings-Redacted.pdf

Appendix B - EM&CP Filing Notices.pdf
Appendix B - EM&CP Filing Notices.pdf

Appendix C - Compliance Assurance Plan.pdf
Appendix C - Compliance Assurance Plan.pdf

Appendix D - Documentation of CI Consultations_Redacted.pdf
Appendix D - Documentation of CI Consultations_Redacted.pdf

Appendix E - CMI Mattress Installation Manual.pdf
Appendix E - CMI Mattress Installation Manual.pdf

Appendix F - PIP & Complaint Resolution Plan.pdf
Appendix F - PIP & Complaint Resolution Plan.pdf

Appendix G - Invasive Species Control Plan.pdf
Appendix G - Invasive Species Control Plan.pdf

Appendix H - Cultural Resources Management Plan.pdf
Appendix H - Cultural Resources Management Plan.pdf

Appenidx I - Agency Correspondence.pdf
Appenidx I - Agency Correspondence.pdf




Order Approving Converter Station

Order Approving Converter Station EMCP

Notice of Construction of Converter Station

CHPE Notice for Construction of Converter Station

Appendix C.04. Site Plan - Retaining Wall.pdf
Appendix C.04. Site Plan - Retaining Wall.pdf
230131 Cover Letter Filing Converter Station EMCP.pdf
230131 Cover Letter Filing Converter Station EMCP.pdf
230131_Astoria HVDC Converter Station EM&CP Narrative.pdf
230131_Astoria HVDC Converter Station EM&CP Narrative.pdf
Appendix A. Agency Correspondence.pdf
Appendix A. Agency Correspondence.pdf
Appendix B. EM&CP Filing Notices.pdf
Appendix B. EM&CP Filing Notices.pdf
Appendix C.01. Site Plan - Civil.pdf
Appendix C.01. Site Plan - Civil.pdf
Appendix C.02. Site Plan - Drainage.pdf
Appendix C.02. Site Plan - Drainage.pdf
Appendix C.03. Site Plan - Pavement.pdf
Appendix C.03. Site Plan - Pavement.pdf
Appendix C.05. Site Plan - Utilities_Part 1 of 2.pdf
Appendix C.05. Site Plan - Utilities_Part 1 of 2.pdf
Appendix C.05. Site Plan - Utilities_Part 2 of 2.pdf
Appendix C.05. Site Plan - Utilities_Part 2 of 2.pdf
Appendix C.06. Structural Drawings - Site Piles and Foundations.pdf
Appendix C.06. Structural Drawings - Site Piles and Foundations.pdf
Appendix C.07. Structural Drawings - Service and Converter Station Building Piles & Foundations.pdf
Appendix C.07. Structural Drawings - Service and Converter Station Building Piles & Foundations.pdf
Appendix C.08. Structural Drawings - Auxiliary Enclosures Piles & Foundations.pdf
Appendix C.08. Structural Drawings - Auxiliary Enclosures Piles & Foundations.pdf
Appendix C.09. Structural Drawings - Site.pdf
Appendix C.09. Structural Drawings - Site.pdf
Appendix C.10. Structural Drawings - Converter and Service Building_Part 1 of 2.pdf
Appendix C.10. Structural Drawings - Converter and Service Building_Part 1 of 2.pdf
Appendix C.10. Structural Drawings - Converter and Service Building_Part 2 of 2.pdf
Appendix C.10. Structural Drawings - Converter and Service Building_Part 2 of 2.pdf
Appendix C.11. Structural Drawings - Auxiliary Enclosures.pdf
Appendix C.11. Structural Drawings - Auxiliary Enclosures.pdf
Appendix C.12. Architecture Drawings - Converter and Service Building_Part 1 of 4.pdf
Appendix C.12. Architecture Drawings - Converter and Service Building_Part 1 of 4.pdf
Appendix C.12. Architecture Drawings - Converter and Service Building_Part 2 of 4.pdf
Appendix C.12. Architecture Drawings - Converter and Service Building_Part 2 of 4.pdf
Appendix C.12. Architecture Drawings - Converter and Service Building_Part 3 of 4.pdf
Appendix C.12. Architecture Drawings - Converter and Service Building_Part 3 of 4.pdf
Appendix C.12. Architecture Drawings - Converter and Service Building_Part 4 of 4.pdf
Appendix C.12. Architecture Drawings - Converter and Service Building_Part 4 of 4.pdf
Appendix C.13. Architecture Drawings - Auxiliary Enclosures.pdf
Appendix C.13. Architecture Drawings - Auxiliary Enclosures.pdf
Appendix C.14. Energy Package - Converter and Service Building.pdf
Appendix C.14. Energy Package - Converter and Service Building.pdf
Appendix C.15. Energy Package - Auxiliary Enclosures.pdf
Appendix C.15. Energy Package - Auxiliary Enclosures.pdf
Appendix C.16. Electrical Drawings_Part 1 of 6.pdf
Appendix C.16. Electrical Drawings_Part 1 of 6.pdf
Appendix C.16. Electrical Drawings_Part 2 of 6.pdf
Appendix C.16. Electrical Drawings_Part 2 of 6.pdf
Appendix C.16. Electrical Drawings_Part 3 of 6.pdf
Appendix C.16. Electrical Drawings_Part 3 of 6.pdf
Appendix C.16. Electrical Drawings_Part 4 of 6.pdf
Appendix C.16. Electrical Drawings_Part 4 of 6.pdf
Appendix C.16. Electrical Drawings_Part 5 of 6.pdf
Appendix C.16. Electrical Drawings_Part 5 of 6.pdf
Appendix C.16. Electrical Drawings_Part 6 of 6.pdf
Appendix C.16. Electrical Drawings_Part 6 of 6.pdf
Appendix C.17. Fire Protection Drawings - Clean Ageny Fire Extinguishing.pdf
Appendix C.17. Fire Protection Drawings - Clean Ageny Fire Extinguishing.pdf
Appendix C.18. Fire Protection Drawings - Fire Alarm.pdf
Appendix C.18. Fire Protection Drawings - Fire Alarm.pdf
Appendix C.19. Fire Protection Drawings - Water-Based Fire Supression.pdf
Appendix C.19. Fire Protection Drawings - Water-Based Fire Supression.pdf
Appendix C.20. Mechanical Drawings - Converter and Service Building.pdf
Appendix C.20. Mechanical Drawings - Converter and Service Building.pdf
Appendix C.21. Mechanical Drawings - Auxiliary Enclosures.pdf
Appendix C.21. Mechanical Drawings - Auxiliary Enclosures.pdf
Appendix C.22. Plumbing Drawings - Site.pdf
Appendix C.22. Plumbing Drawings - Site.pdf
Appendix C.23. Plumbing Drawings - Service Building.pdf
Appendix C.23. Plumbing Drawings - Service Building.pdf
Appendix C.24. Zoning Package.pdf
Appendix C.24. Zoning Package.pdf
Appendix C.25. Communications Package_ Part 1 of 2.pdf
Appendix C.25. Communications Package_Part 1 of 2.pdf
Appendix C.25. Communications Package_Part 2 of 2.pdf
Appendix C.25. Communications Package_Part 2 of 2.pdf
Appendix C.26. FDNY Package.pdf
Appendix C.26. FDNY Package.pdf
Appendix D. BMP Crosswalk Astoria Converter Station EM&CP.pdf
Appendix D. BMP Crosswalk Astoria Converter Station EM&CP.pdf
Appendix E. Compliance Assurance Plan.pdf
Appendix E. Compliance Assurance Plan.pdf
Appendix F. Stormwater Pollution Prevention Plan (SWPPP)_Part 1 of 3.pdf
Appendix F. Stormwater Pollution Prevention Plann (SWPPP)_Part 1 of 3.pdf
Appendix F. Stormwater Pollution Prevention Plan (SWPPP)_Part 2 of 3.pdf
Appendix F. Stormwater Pollution Prevention Plann (SWPPP)_Part 2 of 3.pdf
Appendix F. Stormwater Pollution Prevention Plan (SWPPP)_Part 3 of 3.pdf
Appendix F. Stormwater Pollution Prevention Plann (SWPPP)_Part 3 of 3.pdf
Appendix G. Construction and Safety Policies and Procedures.pdf
Appendix G. Construction and Safety Policies and Procedures.pdf
Appendix H. Public Involvement and Complaint Resolution Plan.pdf
Appendix H. Public Involvement and Complaint Resolution Plan.pdf
Appendix I. Spill Prevention Control and Countermeasures (SPCC).pdf
Appendix I. Spill Prevention Control and Countermeasures (SPCC).pdf
Appendix J. Soil and Materials Management Plan.pdf
Appendix J. Soil and Materials Management Plan.pdf
Appendix K. Invasive Species Control Plan.pdf
Appendix K. Invasive Species Control Plan.pdf
Appendix L. Cultural Resources Management Plan_Public-Redacted.pdf
Appendix L. Cultural Resources Management Plan_Public-Redacted.pdf
Appendix M. Documentation of CI Consultation Occurred_Public-Redacted.pdf
Appendix M. Documentation of CI Consultation Occurred_Public-Redacted.pdf
Appendix N. Noise Assessment Report.pdf
Appendix N. Noise Assessment Report.pdf




PSC Approval Order

Order Approving Segment 3

Segment 3_Appx A_Agency Correspondence_Package 1C+2_IFC _Submittal Set_04122023

Segment 3_Appx A_Agency Correspondence_Package 1C+2_IFC _Submittal Set_04122023

Segment 3_Appx B_EM&CP Filing Notices

Segment 3_Appx B_EM&CP Filing Notices

Segment 3_EMCP Narrative_Pkg1C-2_IFC_SubmittalSet_04122023

Segment 3_EMCP Narrative_Pkg1C-2_IFC_SubmittalSet_04122023

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 1 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 1 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 2 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 2 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 3 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 3 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 4 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 4 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 5 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 5 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 6 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 6 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 7 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 7 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 8 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 8 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 9 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 9 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 10 of 10

Segment 3_Appx C_PnP Drawings_Pkg 1C_IFC_Submittal Part 10 of 10

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 1 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 1 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 2 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 2 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 3 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 3 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 4 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 4 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 5 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 5 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 6 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 6 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 7 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 7 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 8 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 8 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 9 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 9 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 10 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 10 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 11 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 11 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 12 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 12 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 13 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 13 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 14 of 14

Segment 3_Appx C_PnP Drawings_Pkg 2_IFC_Submittal Part 14 of 14

Segment 3_Appx D_BMP Compliance Cross Walk

Segment 3_Appx D_BMP Compliance Cross Walk

Segment 3_Appx E_RevisedDeviationZoneJustification_Pkg1C_IFC_Submittal Set

Segment 3_Appx E_RevisedDeviationZoneJustification_Pkg1C_IFC_Submittal Set

Segment 3_Appx E_RevisedDeviationZoneJustification_Pkg2_IFC_Submittal Set

Segment 3_Appx E_RevisedDeviationZoneJustification_Pkg2_IFC_Submittal Set

Segment 3_Appx F_Compliance Assurance Plan

Segment 3_Appx F_Compliance Assurance Plan

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 1 of 3

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 1 of 3

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 2 of 3

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 2 of 3

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 3 of 3

Segment 3_Appx G_SWPPP_Pkg 1C_IFC_Submittal Set - Stamped Part 3 of 3

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 1 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 1 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 2 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 2 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 3 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 3 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 4 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 4 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 5 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 5 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 6 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 6 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 7 of 7

Segment 3_Appx G_SWPPP_Pkg 2_IFC_Submittal Set - Stamped Part 7 of 7

Segment 3_Appx H_ Construction and Safety Policies and Procedures

Segment 3_Appx H_ Construction and Safety Policies and Procedures

Segment 3_Appx I_Revised Public Involvement Program Plan

Segment 3_Appx I_Revised Public Involvement Program Plan

Segment 3_Appx J_HDD DSR_Pkg1C_IFC_Submittal Set - Stamped Part 1 of 2

Segment 3_Appx J_HDD DSR_Pkg1C_IFC_Submittal Set - Stamped Part 1 of 2

Segment 3_Appx J_HDD DSR_Pkg1C_IFC_Submittal Set - Stamped Part 2 of 2

Segment 3_Appx J_HDD DSR_Pkg1C_IFC_Submittal Set - Stamped Part 2 of 2

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 1 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 1 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 2 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 2 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 3 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 3 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 4 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 4 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 5 of 5

Segment 3_Appx J_HDD DSR_Pkg2_IFC_Submittal Set - Stamped Part 5 of 5

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 1 of 3

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 1 of 3

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 2 of 3

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 2 of 3

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 3 of 3

Segment 3_Appx J_HDD IRCP_Pkg2_IFC_Submittal Set - Stamped Part 3 of 3

Segment 3_Appx K_RevisedSPCC_Pkg1C-2_IFC_Submittal Set

Segment 3_Appx K_RevisedSPCC_Pkg1C-2_IFC_Submittal Set

Segment 3_Appx L - Soil Management Plan-FINAL

Segment 3_Appx L - Soil Management Plan-FINAL

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 1 of 3

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 1 of 3

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 2 of 3

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 2 of 3

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 3 of 3

Segment 3_Appx M_WDR_Pkg1C_IFC_Submittal Set Part 3 of 3

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 1 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 1 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 2 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 2 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 3 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 3 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 4 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 4 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 5 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 5 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 6 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 6 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 7 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 7 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 8 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 8 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 9 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 9 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 10 of 10

Segment 3_Appx M_WDR_Pkg2_IFC_SubmittalSet Part 10 of 10

Segment 3_Appx O_SCRMP_PKG1C_Public

Segment 3_Appx O_SCRMP_PKG1C_Public

Segment 3_Appx O_SCRMP_PKG2_Public

Segment 3_Appx O_SCRMP_PKG2_Public

Segment 3_Appx P_Corrosive Effects Study

Segment 3_Appx P_Corrosive Effects Study

Segment 3_Appx Q_Cable Ampacity and Thermal Calculations

Segment 3_Appx Q_Cable Ampacity and Thermal Calculations

Segment 3_Appx N_Invasive Species Control Plan_Pkg1C_P2_IFC_Submittal Set

Segment 3_Appx N_Invasive Species Control Plan_Pkg1C_P2_IFC_Submittal Set

Segment 3_Appx N_Invasive Species Control Plan_Pkg1C-2_IFC_Submittal Set

Segment 3_Appx N_Invasive Species Control Plan_Pkg1C-2_IFC_Submittal Set

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 1 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 1 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 2 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 2 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 3 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 3 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 4 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 4 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 5 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 5 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 6 of 7 

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 6 of 7

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 7 of 7 

Segment 3_Appx R_ CIConsultation_P1C_IFC_Submittal Set_Part 7 of 7

Segment 3_Appx S_Overland Rock Removal Plan

Segment 3_Appx S_Overland Rock Removal Plan

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 1 of 3

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 1 of 3

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 2 of 3

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 2 of 3

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 3 of 3

Segment 3_Appx T_CHPE Overland_ESSH_REDACTED_IFC_Submittal Part 3 of 3




 

Notice of Major Change 276 to Segment 8 EMCP

Notice of Major Change 276 to Segment 8 EMCP

CN 276_Splice 167A Shift_20241101-0925

CN 276_Splice 167A Shift_20241101-0925

 

230622 Segment 8 and 9 EMCP Approval Order

230622 Segment 8 and 9 EMCP Approval Order

8_Segment 8_EM&CP Narrative_REV3

8_Segment 8_EM&CP Narrative_REV3

9_Segment 9_EM&CP Narrative_REV3

9_Segment 9_EM&CP Narrative_REV3

Newspaper Construction Notice for Segments 8 and 9 EMCP

Newspaper Construction Notice for Segments 8 and 9 EMCP

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-1

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-1

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-2

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-2

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-3

Segment 8 and 9_Appx A_Agency Correspondence_Package 5B_Final_SubmittalPart-3

Segment 8 and 9_Appx B_EM&CP Filing Notices

Segment 8 and 9_Appx B_EM&CP Filing Notices

Segment 8 and 9_Appx D_BMP Compliance Crosswalk

Segment 8 and 9_Appx D_BMP Compliance Crosswalk

Segment 8 and 9_Appx F_Compliance Assurance Plan

Segment 8 and 9_Appx F_Compliance Assurance Plan

Segment 8 and 9_Appx H_ Construction and Safety Policies and Procedures

Segment 8 and 9_Appx H_ Construction and Safety Policies and Procedures

Segment 8 and 9_Appx I_ Public Involvement Plan

Segment 8 and 9_Appx I_ Public Involvement Plan

Segment 8 and 9_Appx K_SPCC_REV2_OCR

Segment 8 and 9_Appx K_SPCC_REV2_OCR

Segment 8 and 9_Appx L_Soil and Materials Management Plan_REV2

Segment 8 and 9_Appx L_Soil and Materials Management Plan_REV2

Segment 8 and 9_Appx N_ Invasive Species Control Plan

Segment 8 and 9_Appx N_ Invasive Species Control Plan

Segment 8 and 9_Appx P_Corrosive Effects Study

Segment 8 and 9_Appx P_Corrosive Effects Study

Segment 8 and 9_Appx Q_Cable Ampacity and Thermal Calculations

Segment 8 and 9_Appx Q_Cable Ampacity and Thermal Calculations

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-1

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-1

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-2

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-2

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-3

Segment 8 and 9_Appx T_CHPE Overland_Env Sensitive Species_REDACTED_Part-3

Segment 8 and 9_Appx U_CSXT Railroad Policies and Guidelines

Segment 8 and 9_Appx U_CSXT Railroad Policies and Guidelines

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 1 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 1 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 2 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 2 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 3 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 3 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 4 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 4 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 5 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 5 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 6 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 6 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 7 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 7 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 8 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 8 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 9 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 9 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 10 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 10 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 11 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 11 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 12 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 12 of 28

Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 13 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 13 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 14 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 14 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 15 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 15 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 16 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 16 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 17 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 17 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 18 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 18 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 19 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 19 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 20 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 20 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 21 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 21 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 22 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 22 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 23 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 23 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 24 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 24 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 25 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 25 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 26 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 26 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 27 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 27 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 28 of 28

Segment 8_Appx C_Plan and Profiles_Pkg 5A_IFC_Submittal_230609_Part 28 of 28

Segment 8_Appx E_Justification for Deviation Zone Excursions_5A_REV1

Segment 8_Appx E_Justification for Deviation Zone Excursions_5A_REV1

Segment 8_Appx G_SWPPP_Pkg5a Part 1 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 1 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 2 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 2 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 3 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 3 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 4 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 4 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 5 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 5 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 6 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 6 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 7 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 7 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 8 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 8 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 9 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 9 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 10 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 10 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 11 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 11 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 12 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 12 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 13 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 13 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 14 of 14

Segment 8_Appx G_SWPPP_Pkg5a Part 14 of 14

Segment 8_Appx J1_HDD BDR_Pkg 5A_IFC

Segment 8_Appx J1_HDD BDR_Pkg 5A_IFC

Segment 8_Appx J2_HDD IR PLAN_Pkg 5A_IFC

Segment 8_Appx J2_HDD IR PLAN_Pkg 5A_IFC

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-1

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-1

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-2

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-2

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-3

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-3

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-4

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-4

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-5

Segment 8_Appx J3_HDD GDR_Pkg 5A_IFC_Part-5

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-4 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-4 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-5 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-5 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-6 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-6 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-7 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-7 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-8 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-8 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-9 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-9 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-10 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-10 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-11 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-11 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-12 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-12 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-13 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-13 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-14 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-14 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-15 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-15 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-16 of 16

Segment 8_Appx M_WDR_pkg5A_Rev2_OCRPart-16 of 16

Segment 8_Appx O_CRMP_Final_Submittal_Public

Segment 8_Appx O_CRMP_Final_Submittal_Public

Segment 8_Appx R_CI Consultations_Package 5A__REV2_Redacted

Segment 8_Appx R_CI Consultations_Package 5A__REV2_Redacted

Segment 8_Appx S_Overland Rock Removal Plan

Segment 8_Appx S_Overland Rock Removal Plan

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 1 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 1 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 2 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 2 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 3 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 3 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 4 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 4 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 5 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 5 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 6 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 6 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 7 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 7 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 8 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 8 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 9 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 9 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 10 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 10 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 11 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 11 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 12 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 12 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 13 of 12

Segment 9_Appx C_Plan and Profiles_Pkg 5B_IFC_Submittal_230609 Part 13 of 12

Segment 9_Appx G_SWPPP_Pkg5b Part 1 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 1 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 2 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 2 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 3 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 3 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 4 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 4 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 5 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 5 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 6 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 6 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 7 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 7 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 8 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 8 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 9 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 9 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 10 of 10

Segment 9_Appx G_SWPPP_Pkg5b Part 10 of 10

Segment 9_Appx J1_HDD BDR_Pkg5B_IFC

Segment 9_Appx J1_HDD BDR_Pkg5B_IFC

Segment 9_Appx J2_HDD IRR Plan_Pkg5B_IFC

Segment 9_Appx J2_HDD IRR Plan_Pkg5B_IFC

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-1 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-1 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-2 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-2 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-3 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-3 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-4 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-4 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-5 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-5 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-6 of 6

Segment 9_Appx M_Wetland and Waterbodies_Pkg5B_IFC-Rev4Part-6 of 6

Segment 9_Appx O_CRMP_FinalSubmittal_Public

O_CRMP_FinalSubmittal_Public

Segment 9_Appx R_CI Consultations_Package 5B__REV2_Redacted

Segment 9_Appx R_CI Consultations_Package 5B__REV2_Redacted

Segment 9_Appx S_Overland Rock Removal Plan

Segment 9_Appx S_Overland Rock Removal Plan

Notice of CN 141_Segment 8 Rotterdam HDD 73 Extension

Notice of CN 141_Segment 8 Rotterdam HDD 73 Extension

Segment 8 CN 141_Rotterdam HDD 73 Extension_Part1

Segment 8 CN 141_Rotterdam HDD 73 Extension_Part1

Segment 8 CN 141_Rotterdam HDD 73 Extension_Part2

Segment 8 CN 141_Rotterdam HDD 73 Extension_Part2

Notices & Map - Change to Segment 8_Rotterdam HDD 73

Notices & Map - Change to Segment 8_Rotterdam HDD 73

240613 CN 094_HDD 73A_Adjust for NG Transmission_20240613_to dps_Part1

240613 CN 094_HDD 73A_Adjust for NG Transmission_20240613_to dps_Part1

240613 CN 094_HDD 73A_Adjust for NG Transmission_20240613_to dps_Part2

240613 CN 094_HDD 73A_Adjust for NG Transmission_20240613_to dps_Part2

240625 Cover Letter filing Notice of EMCP Major Change Segment 9

240625 Cover Letter filing Notice of EMCP Major Change Segment 9

Notices for Major Change 123_HDD 89 Adjustment in Bethlehem

Notices for Major Change 123_HDD 89 Adjustment in Bethlehem

CN 123_HDD 89 Adjustment for NG_20240620-0808

CN 123_HDD 89 Adjustment for NG_20240620-0808




Congers Construction Notice

Congers Construction Notice

 

Cementon HDD Construction Notice

Cementon HDD Construction Notice

 

Three Transitional HDD EMCP

CHPE_Supplemental CRMP_March 2023_FINAL-Public.pdf
CHPE_Supplemental CRMP_March 2023_FINAL-Public.pdf

Construction Notice for Putnam Station HDD.pdf
Construction Notice for Putnam Station HDD.pdf

Narrative - CHPE 3 HDD Final EM&CP - REV1.pdf
Narrative - CHPE 3 HDD Final EM&CP - REV1.pdf

PSC Order Approving Three Transitional HDD EMCP.pdf
PSC Order Approving Three Transitional HDD EMCP.pdf

Appendix A - CHPE 3 HDDs P&P Drawings.pdf
Appendix A - CHPE 3 HDDs P&P Drawings.pdf

Appendix B - EMCP Filing Notices.pdf
Appendix B - EMCP Filing Notices.pdf

Appendix C - Justification for Deviation Zone Excursions.pdf
Appendix C - Justification for Deviation Zone Excursions.pdf

Appendix D - Compliance Assurance Plan.pdf
Appendix D - Compliance Assurance Plan.pdf

Appendix E - Co-Located Infrastructure Documentation.pdf
Appendix E - Co-Located Infrastructure Documentation.pdf

Appendix F - HDD Installation Manual_1 of 3.pdf
Appendix F - HDD Installation Manual_1 of 3.pdf

Appendix F - HDD Installation Manual_2 of 3.pdf
Appendix F - HDD Installation Manual_2 of 3.pdf

Appendix F - HDD Installation Manual_3 of 3.pdf
Appendix F - HDD Installation Manual_3 of 3.pdf

Appendix G - PIP and Complain Resolution Plan.pdf
Appendix G - PIP and Complain Resolution Plan.pdf

Appendix H - Invasive Species Control Plan.pdf
Appendix H - Invasive Species Control Plan.pdf

Appendix I - (Part 1 of 5) Putnam Station HDD SWPPP Report.pdf
Appendix I - (Part 1 of 5) Putnam Station HDD SWPPP Report.pdf

Appendix I - (Part 2 of 5) Putnam Station HDD SWPPP Report.pdf
Appendix I - (Part 2 of 5) Putnam Station HDD SWPPP Report.pdf

Appendix I - (Part 3 of 5) Cementon HDD SWPPP Report.pdf
Appendix I - (Part 3 of 5) Cementon HDD SWPPP Report.pdf

Appendix I - (Part 4 of 5) Cementon HDD SWPPP Report.pdf
Appendix I - (Part 4 of 5) Cementon HDD SWPPP Report.pdf

Appendix I - (Part 5 of 5) Congers HDD SWPPP Report.pdf
Appendix I - (Part 5 of 5) Congers HDD SWPPP Report.pdf

Appendix J - Cultural Resources Management Plan_Redacted.pdf
Appendix J - Cultural Resources Management Plan_Redacted.pdf

Appendix K - Wetland Delineation Reports (Part 1 of 2).pdf
Appendix K - Wetland Delineation Reports (Part 1 of 2).pdf

Appendix K - Wetland Delineation Reports (Part 2 of 2).pdf
Appendix K - Wetland Delineation Reports (Part 2 of 2).pdf

Appendix L - Agency Correspondence.pdf
Appendix L - Agency Correspondence.pdf

Appendix M - Temp Nighttime Lighting Specs.pdf
Appendix M - Temp Nighttime Lighting Specs.pdf

Appendix N - Corrosive Effects Study.pdf
Appendix N - Corrosive Effects Study.pdf

Appendix O - Cable Ampacity and Thermal Calculations.pdf
Appendix O - Cable Ampacity and Thermal Calculations.pdf

Appendix P - Unanticipated Cultural Resource Discovery Plan.pdf
Appendix P - Unanticipated Cultural Resource Discovery Plan.pdf

Appendix Q - Tomkins Cove Laydown Yard Detailed Layout Plan.pdf
Appendix Q - Tomkins Cove Laydown Yard Detailed Layout Plan.pdf